| TYPES OF PROJECTS REVIEWED
|
The Water Resources Permit Advisory Unit regularly reviews many varied forms of permit
requests, ranging from multi-million dollar industrial facilities to projects that may
cost the applicant only the costs of associated permit fees; from expansive projects
extending across the State of Louisiana, to a single pile placed within a waterway; from a
proposed home site in a wetland, to a man-made island serving "roosting" in a
bird sanctuary. Many varied types of requests are received and reviewed every year by the
Water Resources Permit Advisory Unit. Referenced below are some of the most commonly
requested projects submitted for our review, and the general purpose for our interests...
- PROJECT
- REVIEW PURPOSE
- Dredging
- drainage, navigation, levee integrity
- Drilling
- drainage, navigation, levee integrity
- Fill/Spoil Placement
- drainage, navigation, levee integrity
- Pipeline Installations
- navigation, levee integrity
- Cable Installations
- navigation, levee integrity
- Seismic Surveys
- navigation, levee integrity
- Soil Surveys
- levee integrity, groundwater protection
- Cathodic Protection
- levee integrity, groundwater protection
- Water Well Installation
- levee integrity, groundwater protection
- Oil Well Installation
- drainage, navigation, levee integrity
- Monitor Well Installation
- levee integrity, groundwater protection
- Water Control Structures
- drainage, navigation
- Dam & Spillway Construction
- drainage, navigation
- Pump Station Construction
- drainage, levee integrity
- Hydroelectric Facilities
- drainage, navigation, levee integrity
- Pile & Dolphin Installations
- levee integrity, navigation
- Marine Facilities
- levee integrity, navigation
- Bulkheading Installation
- drainage, navigation, levee integrity
- Wharves & Piers
- navigation, levee integrity
- Barge Loading/Unloading
- navigation, levee integrity
- Ship Loading/Unloading
- navigation, levee integrity
- Rip Rap Installation
- navigation, drainage, levee integrity
- Erosion Protection Measures
- drainage, navigation, levee integrity
- Port Facilities
- drainage, navigation, levee integrity
- Fencing Installation
- levee integrity, navigation
- Levee Crown Cattlegaps
- levee integrity
- Roadway Construction
- drainage, levee integrity
- Bridge Construction
- drainage, navigation, levee integrity
- Culvert Installations
- drainage, navigation, levee integrity
- Fender Installations
- navigation
- Launch Ways Construction
- navigation, levee integrity
- Marsh Management
- drainage, navigation
- Agricultural Activities
- drainage
- Aquacultural Programs
- drainage, levee integrity
- Ditch Construction
- drainage
- Intake Structures
- navigation, levee integrity
- Outfall Structures
- navigation, levee integrity
- Demolition Activities
- levee integrity, navigation, drainage
- Sewerage Facilities
- levee integrity
- Stockpile Operations
- levee integrity, drainage
- Parking Lot Construction
- levee integrity, drainage
- Swimming Pools
- levee integrity
- Levee Construction
- drainage, navigation
The permit request examples referenced above represent a small sample of the projects
that the Water Resources Permit Advisory Unit routinely reviews and for which comments are
issued. The samples do not reflect unique requests received.
~ close window ~