Projects to be Let in the Next 6 Months - By Parish

PLEASE NOTE:

Projects TENTATIVELY scheduled to be let within the next 6 months. The Letting Dates are contingent upon availability of funds and completion of all pre-construction activities.

Parish Letting
Date
Project Route Project Name Type Improvement Estimated
Cost Range
Length
(miles)
Project Manager Util Clear Date
Acadia Sep 2009 713-01-0115   Wikoff Cove Rd and Meche Rd Bridges Bridge Replacement $1,000,000 to $2,500,000 0.00 Pentek, Gary  
Acadia Oct 2009 713-01-0117   Connie Rd and Deer Rd Bridges Bridge Replacement $500,000 to $1,000,000 0.00 Pentek, Gary  
Acadia Nov 2009 057-03-0051 LA 13 Long Point Gully Scour Repair Scour Repair $100,000 to $250,000 0.03 Guidry, Chris  
Allen Jul 2009 713-02-0118   Sonnier Rd Bridge Over Drain Ditch Bridge Replacement $250,000 to $500,000 0.01 Pentek, Gary  
Allen Sep 2009 713-02-0131   Road No.162(Reed Br. Over Calcasieu Bridge Replacement $1,000,000 to $2,500,000 0.00 Pentek, Gary  
Ascension Jul 2009 077-30-0024 LA 429 La 73 - La 44 Mill and Overlay $2,500,000 to $5,000,000 4.66 Beauvais, Hewitt  
Ascension Oct 2009 260-01-0020 LA 42 Amite River Relief Bridge Bridge Replacement $1,000,000 to $2,500,000 0.40 Guidry, Chris Feb 2009
Ascension Oct 2009 744-03-0010 LA 939 Bayou Francois Sidewalk Sidewalk, Ped Bridge, Landscaping $500,000 to $1,000,000 0.01 Horton, Valerie  
Ascension Dec 2009 077-02-0020 LA 73 La 73 Widening (Us 61 - I-10) Widen to 3-lanes and Urban Drainage $15,000,000 to $20,000,000 2.32 Burst, Jeffery Sep 2009
Avoyelles Jul 2009 713-05-0121   Fuqua Crossing Bridge Bridge Replacement $250,000 to $500,000 0.00 Pentek, Gary  
Avoyelles Sep 2009 375-03-0009 LA 361 Intersection @ La 362 Site Flare Improvement $0 to $100,000 0.20 Verret, Nicholas  
Avoyelles Sep 2009 805-21-0009 LA1178 Uprr - End Of Previous Overlay Patch and Overlay $1,000,000 to $2,500,000 4.10 Choate, Rodney  
Bienville Oct 2009 451-04-0052 I 20 Bear Creek Relief Bridges Scour Repair East & West Bound Lane $100,000 to $250,000 1.00 Guidry, Chris  
Bossier Aug 2009 102-03-0013 LA 511 Jimmy Davis E.B. Off Ramp New Conc Pavement $1,000,000 to $2,500,000 0.12 Baugh, Sam  
Bossier Oct 2009 001-03-0079 US 80 Cslm 11.31 - Cslm 18.51 (Wb Rdwy) Cold Plane & Overlay(Incl Shoulder) $1,000,000 to $2,500,000 7.20 Baugh, Sam  
Bossier Dec 2009 808-05-0010 LA 537 Stillhouse Bayou Bridge Bridge Replacement $1,000,000 to $2,500,000 0.04 Yap, Kian Sep 2008
Caddo Jul 2009 025-08-0060 US 171 Desoto Ph Line - Baird Rd Overlay $2,500,000 to $5,000,000 6.56 Baugh, Sam  
Caddo Jul 2009 102-01-0034 LA 511 La 526 - Pines Rd Capacity and Safety Improvements $15,000,000 to $20,000,000 2.10 Toney, Patrick Nov 2007
Caddo Sep 2009 053-09-0080 LA 1 West Service Road (Of La 1) Chip Seal $0 to $100,000 2.60 Broadbent, Ronald  
Caddo Sep 2009 078-03-0022 LA 538 North Junction La 530 - La 1 Chip Seal $100,000 to $250,000 3.47 Broadbent, Ronald  
Caddo Oct 2009 025-08-0065 US 171 Boggy Bayou Scour Repair Scour Repair $500,000 to $1,000,000 0.05 Guidry, Chris  
Caddo Nov 2009 025-09-0005 LA3094 Twelve Mile Bayou Bridge Rehab. Bridge Rehab. $1,000,000 to $2,500,000 0.11 Bucci, Mark  
Caddo Nov 2009 053-09-0053 LA 1 La 1 (Youree Dr) At La 3032 (Kings) Intersection Improvement $5,000,000 to $7,500,000 0.94 Riggs, Laura Aug 2007
Caddo Nov 2009 094-01-0044 LA 173 La 173 Turn Lane Add Nb Turn Lane On La 173 $100,000 to $250,000 0.09 Baugh, Sam  
Caddo Nov 2009 102-02-0042 LA 511 La 511 Street Lighting Add Street Lighting At La 511 & 526 $0 to $100,000 0.23 Baugh, Sam  
Caddo Nov 2009 455-09-0004 I 49 I-49 North (La 173 - La 169) Seg H New Interstate $7,500,000 to $10,000,000 1.99 Umeozulu, Joe Jun 2009
Calcasieu Jul 2009 024-01-0050 US 171 Us 90 - Conoco St. Patch and Overlay $1,000,000 to $2,500,000 2.10 Seilhan, Kevin  
Calcasieu Jul 2009 450-30-0085 I 210 Calc River Bridge- I-10 Interchange Asphaltic Conc Overlay & Patching $15,000,000 to $20,000,000 9.58 Smith, David  
Calcasieu Jul 2009 742-10-0132   Vinton Safe Routes to School New Sidewalks $100,000 to $250,000 0.01 Parsons, Brian  
Calcasieu Sep 2009 810-27-0010 LA 27 La 27 (I-10 - US 90) Patch and Overlay $1,000,000 to $2,500,000 1.59 Seilhan, Kevin  
Calcasieu Sep 2009 810-27-0011 LA 27 La 108 0 I-10 Microsurface With Rut Fill $250,000 to $500,000 2.06 Chenevert, Mark  
Calcasieu Oct 2009 742-10-0114   Elliot Rd @ Gauthier Add Turn Lanes and Signals $1,000,000 to $2,500,000 0.00 Waguespack, Brent Mar 2009
Calcasieu Dec 2009 450-30-0076 I 210 I-210 Prien Lake Pier Prien Lake Pier Protection Rehab $20,000,000 to $30,000,000 0.01 Fossier, Paul  
Caldwell Oct 2009 811-07-0012 LA 849 La 126 - US 165 Ast $250,000 to $500,000 9.41 Mason, Ken  
Cameron Sep 2009 193-01-0042 LA 27 East Gate Ferry Crossing -jct La 82 Microsurface With Rut Fill $1,000,000 to $2,500,000 15.35 Chenevert, Mark  
Cameron Sep 2009 193-02-0049 LA 27 Jct La 82-s End Intracoastal Bridge Microsurface With Rut Fill $1,000,000 to $2,500,000 8.49 Chenevert, Mark  
Cameron Sep 2009 384-01-0020 LA 82 1.39mi E.Texas Ln-.23mi W.Deep B.Rd Patch,Cold Plane,& 1 Lift Hmac Olay $2,500,000 to $5,000,000 7.63 Jiles, Steve  
Cameron Sep 2009 745-12-0003   Pintail Drive Boardwalk Ph 1 & 2 Construction Of Boardwalk $1,000,000 to $2,500,000 0.00 Horton, Valerie  
Claiborne Oct 2009 027-06-0032 US 79 Bayou D'arbonne Bridge Scour Repair $100,000 to $250,000 0.01 Guidry, Chris  
Claiborne Nov 2009 072-02-0012 LA 9 La 9 (Lm 5.58 - Union Ph. Line) Chip Seal $100,000 to $250,000 4.91 Broadbent, Ronald  
Claiborne Nov 2009 085-08-0025 LA 146 L & Nw Railroad Overpass Bridge Replacement $1,000,000 to $2,500,000 0.20 Nakhleh, Jenan Oct 2007
Concordia Jul 2009 026-03-0042 US 425 Us 65 - Foules (Northbound) Cold Plane & Overlay $2,500,000 to $5,000,000 7.14 Mason, Ken  
Concordia Sep 2009 815-07-0007 LA 600 La 565 - La 3203 Interlayer & Overlay $1,000,000 to $2,500,000 3.07 Mason, Ken  
East Baton Rouge Sep 2009 257-04-0025 LA 42 La 42 @ West Lee Drive Intersection Improvements $250,000 to $500,000 0.20 Smith, David Jun 2009
East Baton Rouge Sep 2009 414-01-0041 LA 30 La 73-400' South Of Skip Bertman Dr Mill and Overlay $2,500,000 to $5,000,000 2.30 Beauvais, Hewitt  
East Baton Rouge Sep 2009 742-17-0146   S. Sherwood Forest Blvd Clearing and Grubbing $250,000 to $500,000 0.00 Riggs, Laura Apr 2006
East Baton Rouge Oct 2009 742-17-0155   Jones Creek Road Improvement Clearing & Grubbing $100,000 to $250,000 0.01 Porta, Buddy  
East Baton Rouge Dec 2009 077-05-0043   Br Computer Sig. Sync Ph V Part a Signal Synchronization @ 47 Ints. $5,000,000 to $7,500,000 0.00 Riggs, Laura  
East Baton Rouge Dec 2009 742-17-0143   Centralthruway(Frenchtown-sullivan) C & G and Embankment Construction $2,500,000 to $5,000,000 1.20 Riggs, Laura May 2005
East Baton Rouge Dec 2009 742-17-0153   S.Harrell's Ferry @ S.Sherwood Blvd Intersection Improvement $1,000,000 to $2,500,000 0.00 Riggs, Laura  
East Carroll Jul 2009 020-09-0030 US 65 Sparrow St. - La 2 Mill, Stabilize Base and Overlay $5,000,000 to $7,500,000 4.97 Colquette, Paul  
East Carroll Jul 2009 183-02-0008 LA 596 Millikin Rd - Wainwright Chip Seal - Dbl $0 to $100,000 0.80 Broadbent, Ronald  
East Carroll Aug 2009 337-04-0011 LA 877 West Carroll Ph. Line - La 577 Chip-seal Double $0 to $100,000 0.71 Broadbent, Ronald  
East Feliciana Aug 2009 819-04-0008 LA 961 La 10 - End Of Control Minor Overlay $500,000 to $1,000,000 2.43 Broadbent, Ronald  
Evangeline Nov 2009 203-02-0022 LA 29 Coulee De Manuel Scour Repair Scour Repair $100,000 to $250,000 0.02 Guidry, Chris  
Franklin Jul 2009 169-01-0025 LA 130 Curve Improvements to La 130 Improve Superelevation $100,000 to $250,000 0.34 Drake, Bill  
Franklin Aug 2009 051-03-0030 LA 17 La 577 S. - La 860 Stabilize and Overlay $2,500,000 to $5,000,000 4.86 Mason, Ken  
Franklin Aug 2009 713-21-0119   Union Church,Burke & French Turn Rd Bridge Replacement $1,000,000 to $2,500,000 0.02 Pentek, Gary  
Franklin Sep 2009 026-06-0059 US 425 Chase - Winnsboro (S.Bound) Cold Plane and Overlay $1,000,000 to $2,500,000 2.60 Mason, Ken  
Grant Aug 2009 713-22-0119   Camp Hardtner Rd Bridges Bridge Replacement $1,000,000 to $2,500,000 0.00 Pentek, Gary  
Grant Dec 2009 015-04-0061 US 165 Bear Creek Scour Repair Scour Repair $100,000 to $250,000 0.04 Guidry, Chris  
Iberia Sep 2009 240-03-0027 LA 83 Weeks Island Bridges Bridge Replacement $15,000,000 to $20,000,000 1.98 Nakhleh, Jenan Oct 2007
Iberia Sep 2009 424-04-0055 US 90 Us 90 Service Roads - Capt Cade Rd. New Asphalt Pavement $1,000,000 to $2,500,000 0.50 Babin, Teddy  
Iberia Nov 2009 424-04-0052 US 90 Us 90 Frontage Rds(La83-john Darnll Asphalt New Pavement $5,000,000 to $7,500,000 2.75 Francois, Joelle Jun 2009
Iberville Oct 2009 050-06-0068 LA 1 La 1 Northbound Streetscape Sidewalks, Lighting and Landscaping $250,000 to $500,000 0.01 Horton, Valerie  
Iberville Oct 2009 824-02-0014 LA 75 Milly Canal Bridge Bridge Replacement $500,000 to $1,000,000 0.20 Vaught, Paul Mar 2005
Jackson Jul 2009 316-01-0007 LA 148 La 34 - End Of Control Section Asph2-chip-rip $500,000 to $1,000,000 1.69 Colquette, Paul  
Jackson Jul 2009 321-04-0014 LA 505 Us 167 - La 147 Asph Surface Treatment $250,000 to $500,000 5.22 Colquette, Paul  
Jackson Sep 2009 126-03-0012 LA 499 Caney Creek and Creek Bridges Bridge Replacement $2,500,000 to $5,000,000 0.50 Vaught, Paul Nov 2008
Jefferson Jul 2009 063-04-0039 LA 18 La 18 (Avondale - St.Charles Ph Ln Drainage Improvements $250,000 to $500,000 6.97 Nilforoushan, Mehdi  
Jefferson Jul 2009 063-30-0007 LA 18S La 18 S (Us 90b - La 18) Minor Overlay $250,000 to $500,000 4.13 Broadbent, Ronald  
Jefferson Jul 2009 064-01-0040 LA 1 Caminada Bay Bridge Bridge Replacement $30,000,000 to $50,000,000 0.90 Delatte, Brian Jan 2009
Jefferson Oct 2009 742-26-0066   Segnette Blvd.(Lapalco Blvd-us 90b) Overlay $2,500,000 to $5,000,000 0.00 Riggs, Laura Nov 2008
Jefferson Dec 2009 063-02-0048 LA 18 La 18(4th St.Ext.-burmaster(Gretna) Construct 2 Lanes Se Funds $5,000,000 to $7,500,000 1.73 Riggs, Laura  
Jefferson Davis Oct 2009 003-08-0025 US 90 Us 90 East Of Jennings Patch, Cold Plane & Overlay $500,000 to $1,000,000 2.30 Chenevert, Mark  
Lafayette Jul 2009 032-01-0035 LA 182 Carencro La 182 Multi-use Path Sidewalks/Bike Path $250,000 to $500,000 0.75 Meek, Stephen  
Lafayette Aug 2009 213-05-0035 LA 92 Roundabout At Int. Of La 339 & La92 Roundabouts $500,000 to $1,000,000 0.06 Babin, Teddy  
Lafayette Oct 2009 424-02-0088 US 90 Pinhook to Broussard Widen From 4 to 6 Lanes $20,000,000 to $30,000,000 7.19 Babin, Teddy  
Lafayette Oct 2009 828-14-0027 LA 733 Us 167 - La 92 Stabilize Base and Overlay $5,000,000 to $7,500,000 4.41 Babin, Teddy  
Lafayette Nov 2009 217-01-0017 LA 98 Roundabout La 98 and La 93 Roundabout $250,000 to $500,000 0.68 Babin, Teddy  
Lafayette Nov 2009 828-14-0026 LA 733 Anselm Coulee Scour Repair Scour Repair $100,000 to $250,000 0.02 Guidry, Chris  
Lafourche Jul 2009 407-04-0041 LA 308 St.Charles Bridge - La 20 Cold Plane and Overlay $2,500,000 to $5,000,000 6.51 Branton, Jennifer  
Lafourche Jul 2009 829-22-0012 LA3107 La 3107 (L.M.3.40 - L.M.4.15) Minor Overlay $100,000 to $250,000 0.75 Broadbent, Ronald  
LaSalle Sep 2009 128-05-0021 LA 500 Little River Bridge @ Zenoria Bridge Replacement $7,500,000 to $10,000,000 0.49 Nakhleh, Jenan Jun 2006
Lincoln Oct 2009 695-01-0010 I 20 Tremont Rest Area (East Bound) Reconstruct Rest Area $1,000,000 to $2,500,000 0.01 Fletcher, Curtis  
Lincoln Oct 2009 695-02-0009 I 20 Tremont Rest Area (West Bound) Reconstruct Rest Area $1,000,000 to $2,500,000 0.01 Fletcher, Curtis  
Madison Jul 2009 713-33-0109   Merle Gustafson Road Bridge Bridge Replacement $250,000 to $500,000 0.00 Pentek, Gary  
Morehouse Jul 2009 162-01-0030 LA 593 La 593 Cross Drain Replacement $100,000 to $250,000 0.01 Nilforoushan, Mehdi  
Morehouse Jul 2009 834-11-0005 LA3079 La 138 - La 593 Chip Seal - Dbl $0 to $100,000 1.10 Broadbent, Ronald  
Morehouse Sep 2009 016-03-0024 US 165 Bastrop Side Walk Improvements New Sidewalks $250,000 to $500,000 0.07 Horton, Valerie  
Morehouse Sep 2009 744-34-0002 LA 425 Bastrop Sidewalk Improvements Sidewalk Imp La 424, US 65,& Vine S $250,000 to $500,000 0.01 Meek, Stephen  
Morehouse Sep 2009 834-15-0007 LA8303 Horse Bayou Bridge Bridge Replacement $500,000 to $1,000,000 0.41 Toney, Patrick Oct 2007
Natchitoches Jul 2009 713-35-0114   Hart Rd Bridge Over Bayou Bourbeaux Bridge Replacement $500,000 to $1,000,000 0.00 Pentek, Gary  
Natchitoches Aug 2009 361-01-0008 LA1220 Little River Bridge Bridge Replacement $1,000,000 to $2,500,000 0.20 Peltier, Justin Aug 2008
Natchitoches Sep 2009 034-06-0045 LA 6 R.River Br.-us 71&avoyelles-la 3170 Ultrathin Overlay $1,000,000 to $2,500,000 10.56 Choate, Rodney  
Natchitoches Oct 2009 034-06-0046 LA 6 Red River @ Grand Ecore Bridge Redecking/Deck Rehabilitation $15,000,000 to $20,000,000 0.36 Nakhleh, Jenan  
Natchitoches Dec 2009 034-05-0033 LA 6 Young Bayou Scour Repair Scour Repair $100,000 to $250,000 0.02 Guidry, Chris  
Orleans Jul 2009 704-36-0032   Leon C.Simon(London C-elysian Field Rehab (Phase 1 Srp) $1,000,000 to $2,500,000 0.00 Burst, Jeffery  
Orleans Jul 2009 704-36-0034   Mirabeau(St.Bernard-elysian Fields) Rehab (Phase 1 Srp) $2,500,000 to $5,000,000 0.00 Burst, Jeffery  
Orleans Jul 2009 704-36-0035   Filmore (St.Bernard-elysian Fields) Rehab (Phase 1 Srp) $1,000,000 to $2,500,000 0.00 Burst, Jeffery  
Orleans Jul 2009 704-36-0036   St.Bernard Ave.(I-610 - Filmore) Rehab (Phase 1 Srp) $5,000,000 to $7,500,000 0.00 Burst, Jeffery  
Orleans Jul 2009 704-36-0037   Paris Ave. (I-610 - Mirabeau) Rehab (Phase 1 Srp) $2,500,000 to $5,000,000 0.00 Burst, Jeffery  
Orleans Jul 2009 704-36-0038   Elysian Fields Ave(Lakeshore-us 90) Rehab (Phase 1 Srp) $2,500,000 to $5,000,000 0.00 Burst, Jeffery  
Orleans Aug 2009 018-01-0030 US 11 Us 11 (Irish Bayou - I-10) Drainage Improvements $250,000 to $500,000 0.52 Nilforoushan, Mehdi  
Orleans Aug 2009 704-36-0040   Carrollton Ave. (I-10 - Claiborne) Rehab (Phase 1 Srp) $2,500,000 to $5,000,000 0.00 Burst, Jeffery  
Orleans Aug 2009 704-36-0041   Carrollton Ave(Claiborne-st.Charles Rehab (Phase 1 Srp) $1,000,000 to $2,500,000 0.00 Burst, Jeffery  
Orleans Aug 2009 704-36-0042   Orleans (N.Claiborne-city Park Ave) Rehab (Phase 1 Srp) $5,000,000 to $7,500,000 0.00 Burst, Jeffery  
Orleans Aug 2009 704-36-0043   Miro St. (Elysian Fields - Orleans) Rehab (Phase 1 Srp) $1,000,000 to $2,500,000 0.00 Burst, Jeffery  
Orleans Aug 2009 704-36-0044   N.Galvez St.(Canal Blvd - Marconi) Rehab (Phase 1 Srp) $1,000,000 to $2,500,000 0.00 Burst, Jeffery  
Orleans Aug 2009 704-36-0074   Navarre Ave. (Canal Blvd - Marconi) Rehab (Phase 1 Srp) $500,000 to $1,000,000 0.00 Burst, Jeffery  
Orleans Sep 2009 409-02-0016 LA 406 Roundabout Woodland Hwy @ La 407 Roundabout @ La 406 & La 407 $250,000 to $500,000 0.25 Gaudet, Corey  
Orleans Sep 2009 737-92-0069   Detail Striping and Channelizing Striping and Channelizing Devices $100,000 to $250,000 0.00 Drake, Bill  
Orleans Oct 2009 713-36-0101   Harrison Ave. Br.Over Bayou St.John Bridge Replacement $2,500,000 to $5,000,000 0.01 Pentek, Gary  
Orleans Oct 2009 737-36-0007   City Park (Tricentennial Park) Roadway Improvements/Parking Lot $500,000 to $1,000,000 0.00 Horton, Valerie  
Orleans Nov 2009 704-36-0045   Magazine St.(Us 90.B.-.Nashville) Rehab (Phase 1 Srp) $2,500,000 to $5,000,000 0.00 Burst, Jeffery  
Ouachita Jul 2009 837-15-0008 LA 134 La 134 Cross Drain Replacement Cross Drain Replacement $100,000 to $250,000 0.01 Nilforoushan, Mehdi  
Ouachita Oct 2009 451-06-0148 LA3249 La 3249(Well Road) Bridge Over I-20 Bridge Rehabilitation $2,500,000 to $5,000,000 0.04 Bucci, Mark  
Ouachita Dec 2009 001-09-0075 US 80 Louisville Bridge Rehabilitation (Phase Ii) $5,000,000 to $7,500,000 0.60 Kemp, Kelly  
Ouachita Dec 2009 002-01-0047 US 80 Missouri Pacific RR Bridge @ Sicard Bridge Replacement $2,500,000 to $5,000,000 0.40 Bucci, Mark May 2009
Ouachita Dec 2009 451-06-0142 I 20 I20 @ US 165 Inter-ramp "h" Improve Modify Cross Slope/Raise Bridg Rail $1,000,000 to $2,500,000 0.20 Fossier, Paul  
Plaquemines Aug 2009 062-02-0120 LA 23 Belle Chasse Tunnel Electrical and Mechanical Repairs $1,000,000 to $2,500,000 0.01 Reed, Kevin  
Plaquemines Sep 2009 062-05-0042 LA 23 La 23 (Near Empire) Drainage Improvements $250,000 to $500,000 0.54 Nilforoushan, Mehdi  
Plaquemines Dec 2009 838-03-0018 LA 406 Woodland Highway Widen to 3 Lanes $2,500,000 to $5,000,000 3.00 Branton, Jennifer  
Pointe Coupee Dec 2009 008-03-0056 US 190 Us 190 Morganza Floodway Bridge Bridge Repair $7,500,000 to $10,000,000 3.55 Fossier, Paul  
Rapides Jul 2009 153-01-0020 LA 116 End Of Previous Overlay - La 28 Ctb and Overlay $2,500,000 to $5,000,000 3.85 Choate, Rodney  
Rapides Aug 2009 417-02-0024 LA 28 Vernon Line - Jct La 121 Widen to 4 Lanes La 28 Corridor $30,000,000 to $50,000,000 8.70 Moore, Darrell Dec 2008
Rapides Sep 2009 073-03-0023 LA 112 Us 165 - I-49 Ctb and Overlay $2,500,000 to $5,000,000 6.57 Choate, Rodney  
Rapides Sep 2009 713-40-0120   Texada Road Bridge Bridge Replacement $500,000 to $1,000,000 0.00 Pentek, Gary  
Rapides Dec 2009 015-02-0022 US 165 Flagon Bayou Scour Repair Scour Repair $100,000 to $250,000 0.03 Guidry, Chris  
Rapides Dec 2009 022-03-0051 US 165 Dugdemona River Scour Repair Scour Repair $100,000 to $250,000 0.03 Guidry, Chris  
Richland Jul 2009 071-01-0028 US 425 E.B. Off Ramp - Fragala St. Pcc Patching $2,500,000 to $5,000,000 0.93 Colquette, Paul  
Richland Jul 2009 339-03-0007 LA3048 3.54 Mi N Of La 584 - La 584 Asph2-chip-rip $1,000,000 to $2,500,000 3.54 Colquette, Paul  
Richland Jul 2009 713-42-0141   Big Ridge & Bess Lake Road Bridges Bridge Replacement $500,000 to $1,000,000 0.02 Pentek, Gary  
Richland Jul 2009 842-13-0008 LA 132 La 133 - La 561 Chip Seal - Dbl $100,000 to $250,000 2.15 Broadbent, Ronald  
Richland Aug 2009 161-04-0012 LA 134 La 134 Creek Bridge Bridge Replacement $250,000 to $500,000 0.40 Richard, Ryan Mar 2008
Richland Sep 2009 002-03-0040 US 80 Revitalization Of Downtown Delhi New Sidewalk On State Rts&city Sts. $1,000,000 to $2,500,000 0.01 Horton, Valerie  
Sabine Sep 2009 025-03-0047 US 171 Tom Cordova Rd. - Zwolle Cold Plane and Overlay $1,000,000 to $2,500,000 5.89 Choate, Rodney  
St. Bernard Aug 2009 704-44-0014   Rowley Blvd (La 46 - La 39) Rehab (Phase 1 Srp) $500,000 to $1,000,000 0.00 Burst, Jeffery  
St. Bernard Aug 2009 704-44-0015   Mehle Ave.(La 46 - La 39) Rehab (Phase I Srp) $100,000 to $250,000 0.00 Burst, Jeffery  
St. Bernard Aug 2009 704-44-0017   Cougar Dr. (Benjamin - Genet) Rehab (Phase I Srp) $500,000 to $1,000,000 0.00 Burst, Jeffery  
St. Bernard Aug 2009 704-44-0018   Paris Rd. (La 46 - Ferry Terminal) Rehab (Phase I Srp) $250,000 to $500,000 0.00 Burst, Jeffery  
St. Bernard Aug 2009 704-44-0019   E. Genie St. (Golden - Palmisano) Rehab (Phase I Srp) $500,000 to $1,000,000 0.00 Burst, Jeffery  
St. Bernard Aug 2009 704-44-0020   Packenham (Derbigny - Genie) Rehab (Phase I Srp) $250,000 to $500,000 0.00 Burst, Jeffery  
St. Charles Sep 2009 744-45-0008   St Charles E.B. Multi-use Path,Phii Sidewalks/Bike Paths $250,000 to $500,000 0.00 Horton, Valerie  
St. Charles Oct 2009 428-03-0013 LA3127 La 3127 (E.B.L. Lm 9.7 - I-310) Cold Plane and Overlay $1,000,000 to $2,500,000 1.33 Branton, Jennifer  
St. Helena Oct 2009 713-46-0101   Killian Branch Cr.&e.Hog Branch Br. Bridge Replacement $500,000 to $1,000,000 0.02 Pentek, Gary  
St. John Baptist Oct 2009 848-07-0013   La 628 Turn Lane Intersection Improvement $500,000 to $1,000,000 0.00 Musa, Elnur  
St. Landry Aug 2009 217-02-0014 LA 93 St.Landry Ph.Ln.-s.C/L Of Cankton Asphalt Overlay $1,000,000 to $2,500,000 1.41 Babin, Teddy  
St. Landry Oct 2009 066-08-0015 US 167 Evangeline Parish Line- La 10/La182 Cold Plane,Patch and Overlay $2,500,000 to $5,000,000 9.22 Babin, Teddy  
St. Tammany Jul 2009 006-07-0046 US 90 Middle Middle Pearl River Scour Rep Scour Repair Piers 2 & 3 $500,000 to $1,000,000 0.10 Guidry, Chris  
St. Tammany Jul 2009 018-04-0046 US 11 Interchange Improvements @ US 11 Interchange Improvements $5,000,000 to $7,500,000 0.20 Reviere, Ryan  
St. Tammany Jul 2009 454-04-0038 LA1088 La 1088 At I-12 New Interchange $15,000,000 to $20,000,000 0.50 Burst, Jeffery Mar 2009
Statewide Oct 2009 737-99-0604   I-10 Laf- Br ITS Design-build(Ph 2) I-10 ITS Management From B.R.-laf $10,000,000 to $15,000,000 0.00 Delaney, Elizabeth  
Tangipahoa Jul 2009 737-53-0007   Collector Street Safety Project Signs and Pavement Markings $0 to $100,000 0.00 Monaghan, Terri  
Tangipahoa Aug 2009 853-33-0016 LA1065 1 Mile S Of La 442 Jct-independence Overlay $1,000,000 to $2,500,000 4.09 Schilling, Allison  
Tangipahoa Sep 2009 261-04-0024 LA 22 La 22 (Ponchatoula Drainage Imp) Drainage Improvements $100,000 to $250,000 0.23 Nilforoushan, Mehdi  
Tangipahoa Sep 2009 853-27-0023 LA 40 La 40 - La 1062 (Katrina Debris Rt) C.P., Pav Widen, Drainage $1,000,000 to $2,500,000 2.00 Mcclendon, Jesse  
Tangipahoa Oct 2009 690-29-0008 I 55 Kentwood Weigh Station Rehab. Demo.,Const. and Pit Scale Rehab $2,500,000 to $5,000,000 0.01 Fletcher, Curtis  
Tensas Jul 2009 036-06-0013 LA 128 Curve Improvements to La 128 Improve Superelevation $250,000 to $500,000 1.62 Drake, Bill  
Terrebonne Aug 2009 065-91-0016 LA3087 Bayou Terrebonne Br.& Approaches New 6-lane Bridge (Prospect St Brdg $20,000,000 to $30,000,000 0.13 Nickel, Tim Dec 2008
Terrebonne Aug 2009 245-02-0031 LA 315 La315(S.Of Falgout Can.Br.-crozier) O'lay; Let Aug2009 If Get Hmgp$ $2,500,000 to $5,000,000 9.78 Branton, Jennifer  
Terrebonne Aug 2009 245-90-0058 LA 315 La 315 S.Of Falgout Br-crozier Dr. O'lay-only Let Aug2009 If Get Hmgp$ $1,000,000 to $2,500,000 9.75 Branton, Jennifer  
Terrebonne Oct 2009 737-55-0003   Houma ITS Phase 3 Its Emergency Ope $1,000,000 to $2,500,000 0.00 Delaney, Elizabeth  
Union Aug 2009 069-03-0018 LA 33 La 33 Creek Bridge Bridge Replacement $500,000 to $1,000,000 0.40 Herath, Ananda Dec 2008
Vermilion Aug 2009 397-03-0022 LA 330 Bayou Tigre Bridge Repairs Movable Bridge Gear Rack Replacemnt $250,000 to $500,000 0.01 Berner, Darrick  
Vermilion Oct 2009 857-66-0014 LA3147 Humble Canal Bridge New Hydraulic Winch System $250,000 to $500,000 0.01 Harter, John  
Vernon Jul 2009 066-02-0022 LA 10 4.8 Miles West - Jct La 399 Patch and Overlay $1,000,000 to $2,500,000 4.83 Choate, Rodney  
Washington Jul 2009 047-02-0033 LA 10 La 10 Left Turnlane In Franklinton Construct Lt Turnlane $100,000 to $250,000 0.17 Drake, Bill  
Webster Aug 2009 086-02-0038 US 371 Us 371 Improvements Passing Lanes $2,500,000 to $5,000,000 4.83 Baugh, Sam  
Webster Oct 2009 001-04-0034 US 80 Mile Creek Bridge Scour Repair $100,000 to $250,000 0.01 Guidry, Chris  
Webster Nov 2009 001-04-0037 US 80 Us 80 (Bossier Ph Line-l.M.4.84) Chip Seal $100,000 to $250,000 4.84 Broadbent, Ronald  
West Baton Rouge Oct 2009 008-01-0049 US 190 Upgrade Barrier Rails On US 190 Upgrade Barrier Rails On US 190 $250,000 to $500,000 0.15 Stutes, Joshua  
West Carroll Jul 2009 862-01-0008 LA 879 La 585 - La 2 Chip Seal 2 $250,000 to $500,000 5.68 Broadbent, Ronald  
Winn Jul 2009 023-05-0041 US 167 Us 167 N. Gateway Enhancement Landscaping $250,000 to $500,000 0.75 Horton, Valerie  
Winn Jul 2009 127-05-0015 LA 127 La 127 Bridges Near Hickory Valley Bridge Replacement $2,500,000 to $5,000,000 4.61 Richard, Ryan Feb 2009
Winn Sep 2009 093-01-0021 LA 501 La 501 (Garret Rd - La 1232) Patch and Overlay $250,000 to $500,000 1.00 Broadbent, Ronald  