Projects to be Let in the Next 6 Months - By Parish
PLEASE NOTE:
Projects TENTATIVELY scheduled to be let within the next 6 months. The Letting Dates are contingent upon availability of funds and completion of all pre-construction activities.
| Parish | Letting Date |
Project | Route | Project Name | Type Improvement | Estimated Cost Range |
Length (miles) |
Project Manager | Util Clear Date |
|---|---|---|---|---|---|---|---|---|---|
| Acadia | Sep 2009 | 713-01-0115 | Wikoff Cove Rd and Meche Rd Bridges | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Acadia | Oct 2009 | 713-01-0117 | Connie Rd and Deer Rd Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Acadia | Nov 2009 | 057-03-0051 | LA 13 | Long Point Gully Scour Repair | Scour Repair | $100,000 to $250,000 | 0.03 | Guidry, Chris | |
| Allen | Jul 2009 | 713-02-0118 | Sonnier Rd Bridge Over Drain Ditch | Bridge Replacement | $250,000 to $500,000 | 0.01 | Pentek, Gary | ||
| Allen | Sep 2009 | 713-02-0131 | Road No.162(Reed Br. Over Calcasieu | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Ascension | Jul 2009 | 077-30-0024 | LA 429 | La 73 - La 44 | Mill and Overlay | $2,500,000 to $5,000,000 | 4.66 | Beauvais, Hewitt | |
| Ascension | Oct 2009 | 260-01-0020 | LA 42 | Amite River Relief Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.40 | Guidry, Chris | Feb 2009 |
| Ascension | Oct 2009 | 744-03-0010 | LA 939 | Bayou Francois Sidewalk | Sidewalk, Ped Bridge, Landscaping | $500,000 to $1,000,000 | 0.01 | Horton, Valerie | |
| Ascension | Dec 2009 | 077-02-0020 | LA 73 | La 73 Widening (Us 61 - I-10) | Widen to 3-lanes and Urban Drainage | $15,000,000 to $20,000,000 | 2.32 | Burst, Jeffery | Sep 2009 |
| Avoyelles | Jul 2009 | 713-05-0121 | Fuqua Crossing Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Avoyelles | Sep 2009 | 375-03-0009 | LA 361 | Intersection @ La 362 | Site Flare Improvement | $0 to $100,000 | 0.20 | Verret, Nicholas | |
| Avoyelles | Sep 2009 | 805-21-0009 | LA1178 | Uprr - End Of Previous Overlay | Patch and Overlay | $1,000,000 to $2,500,000 | 4.10 | Choate, Rodney | |
| Bienville | Oct 2009 | 451-04-0052 | I 20 | Bear Creek Relief Bridges | Scour Repair East & West Bound Lane | $100,000 to $250,000 | 1.00 | Guidry, Chris | |
| Bossier | Aug 2009 | 102-03-0013 | LA 511 | Jimmy Davis E.B. Off Ramp | New Conc Pavement | $1,000,000 to $2,500,000 | 0.12 | Baugh, Sam | |
| Bossier | Oct 2009 | 001-03-0079 | US 80 | Cslm 11.31 - Cslm 18.51 (Wb Rdwy) | Cold Plane & Overlay(Incl Shoulder) | $1,000,000 to $2,500,000 | 7.20 | Baugh, Sam | |
| Bossier | Dec 2009 | 808-05-0010 | LA 537 | Stillhouse Bayou Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.04 | Yap, Kian | Sep 2008 |
| Caddo | Jul 2009 | 025-08-0060 | US 171 | Desoto Ph Line - Baird Rd | Overlay | $2,500,000 to $5,000,000 | 6.56 | Baugh, Sam | |
| Caddo | Jul 2009 | 102-01-0034 | LA 511 | La 526 - Pines Rd | Capacity and Safety Improvements | $15,000,000 to $20,000,000 | 2.10 | Toney, Patrick | Nov 2007 |
| Caddo | Sep 2009 | 053-09-0080 | LA 1 | West Service Road (Of La 1) | Chip Seal | $0 to $100,000 | 2.60 | Broadbent, Ronald | |
| Caddo | Sep 2009 | 078-03-0022 | LA 538 | North Junction La 530 - La 1 | Chip Seal | $100,000 to $250,000 | 3.47 | Broadbent, Ronald | |
| Caddo | Oct 2009 | 025-08-0065 | US 171 | Boggy Bayou Scour Repair | Scour Repair | $500,000 to $1,000,000 | 0.05 | Guidry, Chris | |
| Caddo | Nov 2009 | 025-09-0005 | LA3094 | Twelve Mile Bayou Bridge Rehab. | Bridge Rehab. | $1,000,000 to $2,500,000 | 0.11 | Bucci, Mark | |
| Caddo | Nov 2009 | 053-09-0053 | LA 1 | La 1 (Youree Dr) At La 3032 (Kings) | Intersection Improvement | $5,000,000 to $7,500,000 | 0.94 | Riggs, Laura | Aug 2007 |
| Caddo | Nov 2009 | 094-01-0044 | LA 173 | La 173 Turn Lane | Add Nb Turn Lane On La 173 | $100,000 to $250,000 | 0.09 | Baugh, Sam | |
| Caddo | Nov 2009 | 102-02-0042 | LA 511 | La 511 Street Lighting | Add Street Lighting At La 511 & 526 | $0 to $100,000 | 0.23 | Baugh, Sam | |
| Caddo | Nov 2009 | 455-09-0004 | I 49 | I-49 North (La 173 - La 169) Seg H | New Interstate | $7,500,000 to $10,000,000 | 1.99 | Umeozulu, Joe | Jun 2009 |
| Calcasieu | Jul 2009 | 024-01-0050 | US 171 | Us 90 - Conoco St. | Patch and Overlay | $1,000,000 to $2,500,000 | 2.10 | Seilhan, Kevin | |
| Calcasieu | Jul 2009 | 450-30-0085 | I 210 | Calc River Bridge- I-10 Interchange | Asphaltic Conc Overlay & Patching | $15,000,000 to $20,000,000 | 9.58 | Smith, David | |
| Calcasieu | Jul 2009 | 742-10-0132 | Vinton Safe Routes to School | New Sidewalks | $100,000 to $250,000 | 0.01 | Parsons, Brian | ||
| Calcasieu | Sep 2009 | 810-27-0010 | LA 27 | La 27 (I-10 - US 90) | Patch and Overlay | $1,000,000 to $2,500,000 | 1.59 | Seilhan, Kevin | |
| Calcasieu | Sep 2009 | 810-27-0011 | LA 27 | La 108 0 I-10 | Microsurface With Rut Fill | $250,000 to $500,000 | 2.06 | Chenevert, Mark | |
| Calcasieu | Oct 2009 | 742-10-0114 | Elliot Rd @ Gauthier | Add Turn Lanes and Signals | $1,000,000 to $2,500,000 | 0.00 | Waguespack, Brent | Mar 2009 | |
| Calcasieu | Dec 2009 | 450-30-0076 | I 210 | I-210 Prien Lake Pier | Prien Lake Pier Protection Rehab | $20,000,000 to $30,000,000 | 0.01 | Fossier, Paul | |
| Caldwell | Oct 2009 | 811-07-0012 | LA 849 | La 126 - US 165 | Ast | $250,000 to $500,000 | 9.41 | Mason, Ken | |
| Cameron | Sep 2009 | 193-01-0042 | LA 27 | East Gate Ferry Crossing -jct La 82 | Microsurface With Rut Fill | $1,000,000 to $2,500,000 | 15.35 | Chenevert, Mark | |
| Cameron | Sep 2009 | 193-02-0049 | LA 27 | Jct La 82-s End Intracoastal Bridge | Microsurface With Rut Fill | $1,000,000 to $2,500,000 | 8.49 | Chenevert, Mark | |
| Cameron | Sep 2009 | 384-01-0020 | LA 82 | 1.39mi E.Texas Ln-.23mi W.Deep B.Rd | Patch,Cold Plane,& 1 Lift Hmac Olay | $2,500,000 to $5,000,000 | 7.63 | Jiles, Steve | |
| Cameron | Sep 2009 | 745-12-0003 | Pintail Drive Boardwalk Ph 1 & 2 | Construction Of Boardwalk | $1,000,000 to $2,500,000 | 0.00 | Horton, Valerie | ||
| Claiborne | Oct 2009 | 027-06-0032 | US 79 | Bayou D'arbonne Bridge | Scour Repair | $100,000 to $250,000 | 0.01 | Guidry, Chris | |
| Claiborne | Nov 2009 | 072-02-0012 | LA 9 | La 9 (Lm 5.58 - Union Ph. Line) | Chip Seal | $100,000 to $250,000 | 4.91 | Broadbent, Ronald | |
| Claiborne | Nov 2009 | 085-08-0025 | LA 146 | L & Nw Railroad Overpass | Bridge Replacement | $1,000,000 to $2,500,000 | 0.20 | Nakhleh, Jenan | Oct 2007 |
| Concordia | Jul 2009 | 026-03-0042 | US 425 | Us 65 - Foules (Northbound) | Cold Plane & Overlay | $2,500,000 to $5,000,000 | 7.14 | Mason, Ken | |
| Concordia | Sep 2009 | 815-07-0007 | LA 600 | La 565 - La 3203 | Interlayer & Overlay | $1,000,000 to $2,500,000 | 3.07 | Mason, Ken | |
| East Baton Rouge | Sep 2009 | 257-04-0025 | LA 42 | La 42 @ West Lee Drive | Intersection Improvements | $250,000 to $500,000 | 0.20 | Smith, David | Jun 2009 |
| East Baton Rouge | Sep 2009 | 414-01-0041 | LA 30 | La 73-400' South Of Skip Bertman Dr | Mill and Overlay | $2,500,000 to $5,000,000 | 2.30 | Beauvais, Hewitt | |
| East Baton Rouge | Sep 2009 | 742-17-0146 | S. Sherwood Forest Blvd | Clearing and Grubbing | $250,000 to $500,000 | 0.00 | Riggs, Laura | Apr 2006 | |
| East Baton Rouge | Oct 2009 | 742-17-0155 | Jones Creek Road Improvement | Clearing & Grubbing | $100,000 to $250,000 | 0.01 | Porta, Buddy | ||
| East Baton Rouge | Dec 2009 | 077-05-0043 | Br Computer Sig. Sync Ph V Part a | Signal Synchronization @ 47 Ints. | $5,000,000 to $7,500,000 | 0.00 | Riggs, Laura | ||
| East Baton Rouge | Dec 2009 | 742-17-0143 | Centralthruway(Frenchtown-sullivan) | C & G and Embankment Construction | $2,500,000 to $5,000,000 | 1.20 | Riggs, Laura | May 2005 | |
| East Baton Rouge | Dec 2009 | 742-17-0153 | S.Harrell's Ferry @ S.Sherwood Blvd | Intersection Improvement | $1,000,000 to $2,500,000 | 0.00 | Riggs, Laura | ||
| East Carroll | Jul 2009 | 020-09-0030 | US 65 | Sparrow St. - La 2 | Mill, Stabilize Base and Overlay | $5,000,000 to $7,500,000 | 4.97 | Colquette, Paul | |
| East Carroll | Jul 2009 | 183-02-0008 | LA 596 | Millikin Rd - Wainwright | Chip Seal - Dbl | $0 to $100,000 | 0.80 | Broadbent, Ronald | |
| East Carroll | Aug 2009 | 337-04-0011 | LA 877 | West Carroll Ph. Line - La 577 | Chip-seal Double | $0 to $100,000 | 0.71 | Broadbent, Ronald | |
| East Feliciana | Aug 2009 | 819-04-0008 | LA 961 | La 10 - End Of Control | Minor Overlay | $500,000 to $1,000,000 | 2.43 | Broadbent, Ronald | |
| Evangeline | Nov 2009 | 203-02-0022 | LA 29 | Coulee De Manuel Scour Repair | Scour Repair | $100,000 to $250,000 | 0.02 | Guidry, Chris | |
| Franklin | Jul 2009 | 169-01-0025 | LA 130 | Curve Improvements to La 130 | Improve Superelevation | $100,000 to $250,000 | 0.34 | Drake, Bill | |
| Franklin | Aug 2009 | 051-03-0030 | LA 17 | La 577 S. - La 860 | Stabilize and Overlay | $2,500,000 to $5,000,000 | 4.86 | Mason, Ken | |
| Franklin | Aug 2009 | 713-21-0119 | Union Church,Burke & French Turn Rd | Bridge Replacement | $1,000,000 to $2,500,000 | 0.02 | Pentek, Gary | ||
| Franklin | Sep 2009 | 026-06-0059 | US 425 | Chase - Winnsboro (S.Bound) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.60 | Mason, Ken | |
| Grant | Aug 2009 | 713-22-0119 | Camp Hardtner Rd Bridges | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Grant | Dec 2009 | 015-04-0061 | US 165 | Bear Creek Scour Repair | Scour Repair | $100,000 to $250,000 | 0.04 | Guidry, Chris | |
| Iberia | Sep 2009 | 240-03-0027 | LA 83 | Weeks Island Bridges | Bridge Replacement | $15,000,000 to $20,000,000 | 1.98 | Nakhleh, Jenan | Oct 2007 |
| Iberia | Sep 2009 | 424-04-0055 | US 90 | Us 90 Service Roads - Capt Cade Rd. | New Asphalt Pavement | $1,000,000 to $2,500,000 | 0.50 | Babin, Teddy | |
| Iberia | Nov 2009 | 424-04-0052 | US 90 | Us 90 Frontage Rds(La83-john Darnll | Asphalt New Pavement | $5,000,000 to $7,500,000 | 2.75 | Francois, Joelle | Jun 2009 |
| Iberville | Oct 2009 | 050-06-0068 | LA 1 | La 1 Northbound Streetscape | Sidewalks, Lighting and Landscaping | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| Iberville | Oct 2009 | 824-02-0014 | LA 75 | Milly Canal Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.20 | Vaught, Paul | Mar 2005 |
| Jackson | Jul 2009 | 316-01-0007 | LA 148 | La 34 - End Of Control Section | Asph2-chip-rip | $500,000 to $1,000,000 | 1.69 | Colquette, Paul | |
| Jackson | Jul 2009 | 321-04-0014 | LA 505 | Us 167 - La 147 | Asph Surface Treatment | $250,000 to $500,000 | 5.22 | Colquette, Paul | |
| Jackson | Sep 2009 | 126-03-0012 | LA 499 | Caney Creek and Creek Bridges | Bridge Replacement | $2,500,000 to $5,000,000 | 0.50 | Vaught, Paul | Nov 2008 |
| Jefferson | Jul 2009 | 063-04-0039 | LA 18 | La 18 (Avondale - St.Charles Ph Ln | Drainage Improvements | $250,000 to $500,000 | 6.97 | Nilforoushan, Mehdi | |
| Jefferson | Jul 2009 | 063-30-0007 | LA 18S | La 18 S (Us 90b - La 18) | Minor Overlay | $250,000 to $500,000 | 4.13 | Broadbent, Ronald | |
| Jefferson | Jul 2009 | 064-01-0040 | LA 1 | Caminada Bay Bridge | Bridge Replacement | $30,000,000 to $50,000,000 | 0.90 | Delatte, Brian | Jan 2009 |
| Jefferson | Oct 2009 | 742-26-0066 | Segnette Blvd.(Lapalco Blvd-us 90b) | Overlay | $2,500,000 to $5,000,000 | 0.00 | Riggs, Laura | Nov 2008 | |
| Jefferson | Dec 2009 | 063-02-0048 | LA 18 | La 18(4th St.Ext.-burmaster(Gretna) | Construct 2 Lanes Se Funds | $5,000,000 to $7,500,000 | 1.73 | Riggs, Laura | |
| Jefferson Davis | Oct 2009 | 003-08-0025 | US 90 | Us 90 East Of Jennings | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.30 | Chenevert, Mark | |
| Lafayette | Jul 2009 | 032-01-0035 | LA 182 | Carencro La 182 Multi-use Path | Sidewalks/Bike Path | $250,000 to $500,000 | 0.75 | Meek, Stephen | |
| Lafayette | Aug 2009 | 213-05-0035 | LA 92 | Roundabout At Int. Of La 339 & La92 | Roundabouts | $500,000 to $1,000,000 | 0.06 | Babin, Teddy | |
| Lafayette | Oct 2009 | 424-02-0088 | US 90 | Pinhook to Broussard | Widen From 4 to 6 Lanes | $20,000,000 to $30,000,000 | 7.19 | Babin, Teddy | |
| Lafayette | Oct 2009 | 828-14-0027 | LA 733 | Us 167 - La 92 | Stabilize Base and Overlay | $5,000,000 to $7,500,000 | 4.41 | Babin, Teddy | |
| Lafayette | Nov 2009 | 217-01-0017 | LA 98 | Roundabout La 98 and La 93 | Roundabout | $250,000 to $500,000 | 0.68 | Babin, Teddy | |
| Lafayette | Nov 2009 | 828-14-0026 | LA 733 | Anselm Coulee Scour Repair | Scour Repair | $100,000 to $250,000 | 0.02 | Guidry, Chris | |
| Lafourche | Jul 2009 | 407-04-0041 | LA 308 | St.Charles Bridge - La 20 | Cold Plane and Overlay | $2,500,000 to $5,000,000 | 6.51 | Branton, Jennifer | |
| Lafourche | Jul 2009 | 829-22-0012 | LA3107 | La 3107 (L.M.3.40 - L.M.4.15) | Minor Overlay | $100,000 to $250,000 | 0.75 | Broadbent, Ronald | |
| LaSalle | Sep 2009 | 128-05-0021 | LA 500 | Little River Bridge @ Zenoria | Bridge Replacement | $7,500,000 to $10,000,000 | 0.49 | Nakhleh, Jenan | Jun 2006 |
| Lincoln | Oct 2009 | 695-01-0010 | I 20 | Tremont Rest Area (East Bound) | Reconstruct Rest Area | $1,000,000 to $2,500,000 | 0.01 | Fletcher, Curtis | |
| Lincoln | Oct 2009 | 695-02-0009 | I 20 | Tremont Rest Area (West Bound) | Reconstruct Rest Area | $1,000,000 to $2,500,000 | 0.01 | Fletcher, Curtis | |
| Madison | Jul 2009 | 713-33-0109 | Merle Gustafson Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Morehouse | Jul 2009 | 162-01-0030 | LA 593 | La 593 | Cross Drain Replacement | $100,000 to $250,000 | 0.01 | Nilforoushan, Mehdi | |
| Morehouse | Jul 2009 | 834-11-0005 | LA3079 | La 138 - La 593 | Chip Seal - Dbl | $0 to $100,000 | 1.10 | Broadbent, Ronald | |
| Morehouse | Sep 2009 | 016-03-0024 | US 165 | Bastrop Side Walk Improvements | New Sidewalks | $250,000 to $500,000 | 0.07 | Horton, Valerie | |
| Morehouse | Sep 2009 | 744-34-0002 | LA 425 | Bastrop Sidewalk Improvements | Sidewalk Imp La 424, US 65,& Vine S | $250,000 to $500,000 | 0.01 | Meek, Stephen | |
| Morehouse | Sep 2009 | 834-15-0007 | LA8303 | Horse Bayou Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.41 | Toney, Patrick | Oct 2007 |
| Natchitoches | Jul 2009 | 713-35-0114 | Hart Rd Bridge Over Bayou Bourbeaux | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Natchitoches | Aug 2009 | 361-01-0008 | LA1220 | Little River Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.20 | Peltier, Justin | Aug 2008 |
| Natchitoches | Sep 2009 | 034-06-0045 | LA 6 | R.River Br.-us 71&avoyelles-la 3170 | Ultrathin Overlay | $1,000,000 to $2,500,000 | 10.56 | Choate, Rodney | |
| Natchitoches | Oct 2009 | 034-06-0046 | LA 6 | Red River @ Grand Ecore Bridge | Redecking/Deck Rehabilitation | $15,000,000 to $20,000,000 | 0.36 | Nakhleh, Jenan | |
| Natchitoches | Dec 2009 | 034-05-0033 | LA 6 | Young Bayou Scour Repair | Scour Repair | $100,000 to $250,000 | 0.02 | Guidry, Chris | |
| Orleans | Jul 2009 | 704-36-0032 | Leon C.Simon(London C-elysian Field | Rehab (Phase 1 Srp) | $1,000,000 to $2,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Jul 2009 | 704-36-0034 | Mirabeau(St.Bernard-elysian Fields) | Rehab (Phase 1 Srp) | $2,500,000 to $5,000,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Jul 2009 | 704-36-0035 | Filmore (St.Bernard-elysian Fields) | Rehab (Phase 1 Srp) | $1,000,000 to $2,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Jul 2009 | 704-36-0036 | St.Bernard Ave.(I-610 - Filmore) | Rehab (Phase 1 Srp) | $5,000,000 to $7,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Jul 2009 | 704-36-0037 | Paris Ave. (I-610 - Mirabeau) | Rehab (Phase 1 Srp) | $2,500,000 to $5,000,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Jul 2009 | 704-36-0038 | Elysian Fields Ave(Lakeshore-us 90) | Rehab (Phase 1 Srp) | $2,500,000 to $5,000,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Aug 2009 | 018-01-0030 | US 11 | Us 11 (Irish Bayou - I-10) | Drainage Improvements | $250,000 to $500,000 | 0.52 | Nilforoushan, Mehdi | |
| Orleans | Aug 2009 | 704-36-0040 | Carrollton Ave. (I-10 - Claiborne) | Rehab (Phase 1 Srp) | $2,500,000 to $5,000,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Aug 2009 | 704-36-0041 | Carrollton Ave(Claiborne-st.Charles | Rehab (Phase 1 Srp) | $1,000,000 to $2,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Aug 2009 | 704-36-0042 | Orleans (N.Claiborne-city Park Ave) | Rehab (Phase 1 Srp) | $5,000,000 to $7,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Aug 2009 | 704-36-0043 | Miro St. (Elysian Fields - Orleans) | Rehab (Phase 1 Srp) | $1,000,000 to $2,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Aug 2009 | 704-36-0044 | N.Galvez St.(Canal Blvd - Marconi) | Rehab (Phase 1 Srp) | $1,000,000 to $2,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Aug 2009 | 704-36-0074 | Navarre Ave. (Canal Blvd - Marconi) | Rehab (Phase 1 Srp) | $500,000 to $1,000,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Sep 2009 | 409-02-0016 | LA 406 | Roundabout Woodland Hwy @ La 407 | Roundabout @ La 406 & La 407 | $250,000 to $500,000 | 0.25 | Gaudet, Corey | |
| Orleans | Sep 2009 | 737-92-0069 | Detail Striping and Channelizing | Striping and Channelizing Devices | $100,000 to $250,000 | 0.00 | Drake, Bill | ||
| Orleans | Oct 2009 | 713-36-0101 | Harrison Ave. Br.Over Bayou St.John | Bridge Replacement | $2,500,000 to $5,000,000 | 0.01 | Pentek, Gary | ||
| Orleans | Oct 2009 | 737-36-0007 | City Park (Tricentennial Park) | Roadway Improvements/Parking Lot | $500,000 to $1,000,000 | 0.00 | Horton, Valerie | ||
| Orleans | Nov 2009 | 704-36-0045 | Magazine St.(Us 90.B.-.Nashville) | Rehab (Phase 1 Srp) | $2,500,000 to $5,000,000 | 0.00 | Burst, Jeffery | ||
| Ouachita | Jul 2009 | 837-15-0008 | LA 134 | La 134 Cross Drain Replacement | Cross Drain Replacement | $100,000 to $250,000 | 0.01 | Nilforoushan, Mehdi | |
| Ouachita | Oct 2009 | 451-06-0148 | LA3249 | La 3249(Well Road) Bridge Over I-20 | Bridge Rehabilitation | $2,500,000 to $5,000,000 | 0.04 | Bucci, Mark | |
| Ouachita | Dec 2009 | 001-09-0075 | US 80 | Louisville Bridge | Rehabilitation (Phase Ii) | $5,000,000 to $7,500,000 | 0.60 | Kemp, Kelly | |
| Ouachita | Dec 2009 | 002-01-0047 | US 80 | Missouri Pacific RR Bridge @ Sicard | Bridge Replacement | $2,500,000 to $5,000,000 | 0.40 | Bucci, Mark | May 2009 |
| Ouachita | Dec 2009 | 451-06-0142 | I 20 | I20 @ US 165 Inter-ramp "h" Improve | Modify Cross Slope/Raise Bridg Rail | $1,000,000 to $2,500,000 | 0.20 | Fossier, Paul | |
| Plaquemines | Aug 2009 | 062-02-0120 | LA 23 | Belle Chasse Tunnel | Electrical and Mechanical Repairs | $1,000,000 to $2,500,000 | 0.01 | Reed, Kevin | |
| Plaquemines | Sep 2009 | 062-05-0042 | LA 23 | La 23 (Near Empire) | Drainage Improvements | $250,000 to $500,000 | 0.54 | Nilforoushan, Mehdi | |
| Plaquemines | Dec 2009 | 838-03-0018 | LA 406 | Woodland Highway | Widen to 3 Lanes | $2,500,000 to $5,000,000 | 3.00 | Branton, Jennifer | |
| Pointe Coupee | Dec 2009 | 008-03-0056 | US 190 | Us 190 Morganza Floodway Bridge | Bridge Repair | $7,500,000 to $10,000,000 | 3.55 | Fossier, Paul | |
| Rapides | Jul 2009 | 153-01-0020 | LA 116 | End Of Previous Overlay - La 28 | Ctb and Overlay | $2,500,000 to $5,000,000 | 3.85 | Choate, Rodney | |
| Rapides | Aug 2009 | 417-02-0024 | LA 28 | Vernon Line - Jct La 121 | Widen to 4 Lanes La 28 Corridor | $30,000,000 to $50,000,000 | 8.70 | Moore, Darrell | Dec 2008 |
| Rapides | Sep 2009 | 073-03-0023 | LA 112 | Us 165 - I-49 | Ctb and Overlay | $2,500,000 to $5,000,000 | 6.57 | Choate, Rodney | |
| Rapides | Sep 2009 | 713-40-0120 | Texada Road Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Rapides | Dec 2009 | 015-02-0022 | US 165 | Flagon Bayou Scour Repair | Scour Repair | $100,000 to $250,000 | 0.03 | Guidry, Chris | |
| Rapides | Dec 2009 | 022-03-0051 | US 165 | Dugdemona River Scour Repair | Scour Repair | $100,000 to $250,000 | 0.03 | Guidry, Chris | |
| Richland | Jul 2009 | 071-01-0028 | US 425 | E.B. Off Ramp - Fragala St. | Pcc Patching | $2,500,000 to $5,000,000 | 0.93 | Colquette, Paul | |
| Richland | Jul 2009 | 339-03-0007 | LA3048 | 3.54 Mi N Of La 584 - La 584 | Asph2-chip-rip | $1,000,000 to $2,500,000 | 3.54 | Colquette, Paul | |
| Richland | Jul 2009 | 713-42-0141 | Big Ridge & Bess Lake Road Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.02 | Pentek, Gary | ||
| Richland | Jul 2009 | 842-13-0008 | LA 132 | La 133 - La 561 | Chip Seal - Dbl | $100,000 to $250,000 | 2.15 | Broadbent, Ronald | |
| Richland | Aug 2009 | 161-04-0012 | LA 134 | La 134 Creek Bridge | Bridge Replacement | $250,000 to $500,000 | 0.40 | Richard, Ryan | Mar 2008 |
| Richland | Sep 2009 | 002-03-0040 | US 80 | Revitalization Of Downtown Delhi | New Sidewalk On State Rts&city Sts. | $1,000,000 to $2,500,000 | 0.01 | Horton, Valerie | |
| Sabine | Sep 2009 | 025-03-0047 | US 171 | Tom Cordova Rd. - Zwolle | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 5.89 | Choate, Rodney | |
| St. Bernard | Aug 2009 | 704-44-0014 | Rowley Blvd (La 46 - La 39) | Rehab (Phase 1 Srp) | $500,000 to $1,000,000 | 0.00 | Burst, Jeffery | ||
| St. Bernard | Aug 2009 | 704-44-0015 | Mehle Ave.(La 46 - La 39) | Rehab (Phase I Srp) | $100,000 to $250,000 | 0.00 | Burst, Jeffery | ||
| St. Bernard | Aug 2009 | 704-44-0017 | Cougar Dr. (Benjamin - Genet) | Rehab (Phase I Srp) | $500,000 to $1,000,000 | 0.00 | Burst, Jeffery | ||
| St. Bernard | Aug 2009 | 704-44-0018 | Paris Rd. (La 46 - Ferry Terminal) | Rehab (Phase I Srp) | $250,000 to $500,000 | 0.00 | Burst, Jeffery | ||
| St. Bernard | Aug 2009 | 704-44-0019 | E. Genie St. (Golden - Palmisano) | Rehab (Phase I Srp) | $500,000 to $1,000,000 | 0.00 | Burst, Jeffery | ||
| St. Bernard | Aug 2009 | 704-44-0020 | Packenham (Derbigny - Genie) | Rehab (Phase I Srp) | $250,000 to $500,000 | 0.00 | Burst, Jeffery | ||
| St. Charles | Sep 2009 | 744-45-0008 | St Charles E.B. Multi-use Path,Phii | Sidewalks/Bike Paths | $250,000 to $500,000 | 0.00 | Horton, Valerie | ||
| St. Charles | Oct 2009 | 428-03-0013 | LA3127 | La 3127 (E.B.L. Lm 9.7 - I-310) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 1.33 | Branton, Jennifer | |
| St. Helena | Oct 2009 | 713-46-0101 | Killian Branch Cr.&e.Hog Branch Br. | Bridge Replacement | $500,000 to $1,000,000 | 0.02 | Pentek, Gary | ||
| St. John Baptist | Oct 2009 | 848-07-0013 | La 628 Turn Lane | Intersection Improvement | $500,000 to $1,000,000 | 0.00 | Musa, Elnur | ||
| St. Landry | Aug 2009 | 217-02-0014 | LA 93 | St.Landry Ph.Ln.-s.C/L Of Cankton | Asphalt Overlay | $1,000,000 to $2,500,000 | 1.41 | Babin, Teddy | |
| St. Landry | Oct 2009 | 066-08-0015 | US 167 | Evangeline Parish Line- La 10/La182 | Cold Plane,Patch and Overlay | $2,500,000 to $5,000,000 | 9.22 | Babin, Teddy | |
| St. Tammany | Jul 2009 | 006-07-0046 | US 90 | Middle Middle Pearl River Scour Rep | Scour Repair Piers 2 & 3 | $500,000 to $1,000,000 | 0.10 | Guidry, Chris | |
| St. Tammany | Jul 2009 | 018-04-0046 | US 11 | Interchange Improvements @ US 11 | Interchange Improvements | $5,000,000 to $7,500,000 | 0.20 | Reviere, Ryan | |
| St. Tammany | Jul 2009 | 454-04-0038 | LA1088 | La 1088 At I-12 | New Interchange | $15,000,000 to $20,000,000 | 0.50 | Burst, Jeffery | Mar 2009 |
| Statewide | Oct 2009 | 737-99-0604 | I-10 Laf- Br ITS Design-build(Ph 2) | I-10 ITS Management From B.R.-laf | $10,000,000 to $15,000,000 | 0.00 | Delaney, Elizabeth | ||
| Tangipahoa | Jul 2009 | 737-53-0007 | Collector Street Safety Project | Signs and Pavement Markings | $0 to $100,000 | 0.00 | Monaghan, Terri | ||
| Tangipahoa | Aug 2009 | 853-33-0016 | LA1065 | 1 Mile S Of La 442 Jct-independence | Overlay | $1,000,000 to $2,500,000 | 4.09 | Schilling, Allison | |
| Tangipahoa | Sep 2009 | 261-04-0024 | LA 22 | La 22 (Ponchatoula Drainage Imp) | Drainage Improvements | $100,000 to $250,000 | 0.23 | Nilforoushan, Mehdi | |
| Tangipahoa | Sep 2009 | 853-27-0023 | LA 40 | La 40 - La 1062 (Katrina Debris Rt) | C.P., Pav Widen, Drainage | $1,000,000 to $2,500,000 | 2.00 | Mcclendon, Jesse | |
| Tangipahoa | Oct 2009 | 690-29-0008 | I 55 | Kentwood Weigh Station Rehab. | Demo.,Const. and Pit Scale Rehab | $2,500,000 to $5,000,000 | 0.01 | Fletcher, Curtis | |
| Tensas | Jul 2009 | 036-06-0013 | LA 128 | Curve Improvements to La 128 | Improve Superelevation | $250,000 to $500,000 | 1.62 | Drake, Bill | |
| Terrebonne | Aug 2009 | 065-91-0016 | LA3087 | Bayou Terrebonne Br.& Approaches | New 6-lane Bridge (Prospect St Brdg | $20,000,000 to $30,000,000 | 0.13 | Nickel, Tim | Dec 2008 |
| Terrebonne | Aug 2009 | 245-02-0031 | LA 315 | La315(S.Of Falgout Can.Br.-crozier) | O'lay; Let Aug2009 If Get Hmgp$ | $2,500,000 to $5,000,000 | 9.78 | Branton, Jennifer | |
| Terrebonne | Aug 2009 | 245-90-0058 | LA 315 | La 315 S.Of Falgout Br-crozier Dr. | O'lay-only Let Aug2009 If Get Hmgp$ | $1,000,000 to $2,500,000 | 9.75 | Branton, Jennifer | |
| Terrebonne | Oct 2009 | 737-55-0003 | Houma ITS Phase 3 | Its Emergency Ope | $1,000,000 to $2,500,000 | 0.00 | Delaney, Elizabeth | ||
| Union | Aug 2009 | 069-03-0018 | LA 33 | La 33 Creek Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.40 | Herath, Ananda | Dec 2008 |
| Vermilion | Aug 2009 | 397-03-0022 | LA 330 | Bayou Tigre Bridge Repairs | Movable Bridge Gear Rack Replacemnt | $250,000 to $500,000 | 0.01 | Berner, Darrick | |
| Vermilion | Oct 2009 | 857-66-0014 | LA3147 | Humble Canal Bridge | New Hydraulic Winch System | $250,000 to $500,000 | 0.01 | Harter, John | |
| Vernon | Jul 2009 | 066-02-0022 | LA 10 | 4.8 Miles West - Jct La 399 | Patch and Overlay | $1,000,000 to $2,500,000 | 4.83 | Choate, Rodney | |
| Washington | Jul 2009 | 047-02-0033 | LA 10 | La 10 Left Turnlane In Franklinton | Construct Lt Turnlane | $100,000 to $250,000 | 0.17 | Drake, Bill | |
| Webster | Aug 2009 | 086-02-0038 | US 371 | Us 371 Improvements | Passing Lanes | $2,500,000 to $5,000,000 | 4.83 | Baugh, Sam | |
| Webster | Oct 2009 | 001-04-0034 | US 80 | Mile Creek Bridge | Scour Repair | $100,000 to $250,000 | 0.01 | Guidry, Chris | |
| Webster | Nov 2009 | 001-04-0037 | US 80 | Us 80 (Bossier Ph Line-l.M.4.84) | Chip Seal | $100,000 to $250,000 | 4.84 | Broadbent, Ronald | |
| West Baton Rouge | Oct 2009 | 008-01-0049 | US 190 | Upgrade Barrier Rails On US 190 | Upgrade Barrier Rails On US 190 | $250,000 to $500,000 | 0.15 | Stutes, Joshua | |
| West Carroll | Jul 2009 | 862-01-0008 | LA 879 | La 585 - La 2 | Chip Seal 2 | $250,000 to $500,000 | 5.68 | Broadbent, Ronald | |
| Winn | Jul 2009 | 023-05-0041 | US 167 | Us 167 N. Gateway Enhancement | Landscaping | $250,000 to $500,000 | 0.75 | Horton, Valerie | |
| Winn | Jul 2009 | 127-05-0015 | LA 127 | La 127 Bridges Near Hickory Valley | Bridge Replacement | $2,500,000 to $5,000,000 | 4.61 | Richard, Ryan | Feb 2009 |
| Winn | Sep 2009 | 093-01-0021 | LA 501 | La 501 (Garret Rd - La 1232) | Patch and Overlay | $250,000 to $500,000 | 1.00 | Broadbent, Ronald |