Projects to be Let in the Next 6 Months - By Letting Date
PLEASE NOTE:
Projects TENTATIVELY scheduled to be let within the next 6 months. The Letting Dates are contingent upon availability of funds and completion of all pre-construction activities.
| Parish | Letting Date |
Project | Route | Project Name | Type Improvement | Estimated Cost Range |
Length (miles) |
Project Manager | Util Clear Date |
|---|---|---|---|---|---|---|---|---|---|
| Iberville | Nov 2009 | 050-06-0068 | LA 1 | La 1 Northbound Streetscape | Sidewalks, Lighting and Landscaping | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| St. Tammany | Nov 2009 | 059-02-0035 | LA 25 | Left Turnlane On La 25 @ La 1078 | Pavement Widening,Overlay, Striping | $100,000 to $250,000 | 0.02 | Schilling, Allison | |
| Webster | Nov 2009 | 086-02-0038 | US 371 | Us 371 Improvements | Passing Lanes | $2,500,000 to $5,000,000 | 4.83 | Baugh, Sam | |
| Bossier | Nov 2009 | 102-03-0013 | LA 511 | Jimmy Davis E.B. Off Ramp | New Conc Pavement | $1,000,000 to $2,500,000 | 0.12 | Baugh, Sam | |
| Iberia | Nov 2009 | 424-04-0052 | US 90 | Us 90 Frontage Rds(La83-john Darnll | Asphalt New Pavement | $5,000,000 to $7,500,000 | 2.75 | Francois, Joelle | Jun 2009 |
| St. Charles | Nov 2009 | 428-03-0013 | LA3127 | La 3127 (E.B.L. Lm 9.7 - I-310) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 1.33 | Riggs, Laura | |
| Ouachita | Nov 2009 | 451-06-0148 | LA3249 | La 3249(Well Road) Bridge Over I-20 | Bridge Rehabilitation | $2,500,000 to $5,000,000 | 0.04 | Bucci, Mark | |
| Caddo | Nov 2009 | 455-09-0004 | I 49 | I-49 North (La 173 - La 169) Seg H | New Interstate | $10,000,000 to $15,000,000 | 1.99 | Umeozulu, Joe | Jun 2009 |
| East Baton Rouge | Nov 2009 | 600-90-0164 | Hurricane Protection Screens- Annex | Construct and Install On Annex Bldg | $250,000 to $500,000 | 0.00 | Murry, Ray | ||
| District 61 | Nov 2009 | 650-99-0031 | Replace Radar System On Ferry Boats | Replace Radar Systems | $250,000 to $500,000 | 0.00 | Reed, Kevin | ||
| Caldwell | Nov 2009 | 713-11-0104 | Childress Road Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Ouachita | Nov 2009 | 713-37-0124 | Rifle Range and Dean Chapel | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| East Baton Rouge | Nov 2009 | 742-17-0143 | Centralthruway(Frenchtown-sullivan) | C & G and Embankment Construction | $2,500,000 to $5,000,000 | 1.20 | Riggs, Laura | May 2005 | |
| East Baton Rouge | Nov 2009 | 742-17-0148 | Central Thruway Bridges | New Bridges (Beaver Bayou 2 & 3) | $5,000,000 to $7,500,000 | 0.00 | Riggs, Laura | ||
| Avoyelles | Nov 2009 | 744-05-0015 | Renovation Of Sarto Iron Bridge | Struct Repair/Convert to Ped Bridge | $250,000 to $500,000 | 0.00 | Horton, Valerie | ||
| Cameron | Nov 2009 | 745-12-0003 | Pintail Drive Boardwalk Ph 1 & 2 | Construction Of Boardwalk | $1,000,000 to $2,500,000 | 0.00 | Horton, Valerie | ||
| Webster | Dec 2009 | 001-04-0034 | US 80 | Mile Creek Bridge | Scour Repair | $100,000 to $250,000 | 0.01 | Guidry, Chris | |
| Jefferson Davis | Dec 2009 | 003-08-0025 | US 90 | Us 90 East Of Jennings | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.30 | Chenevert, Mark | |
| St. Martin | Dec 2009 | 004-03-0009 | LA 182 | Laf P/L - Iberia P/L | Patch and Overlay | $500,000 to $1,000,000 | 4.92 | Chenevert, Mark | |
| Iberia | Dec 2009 | 004-04-0026 | LA 182 | St Martin P/L-0.2 Mi East Of La 674 | Patch and Overlay | $500,000 to $1,000,000 | 3.11 | Chenevert, Mark | |
| Jefferson | Dec 2009 | 005-10-0039 | US 90 | Us 90(St Char Line-sw End Of Opass) | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 5.90 | Chenevert, Mark | |
| Orleans | Dec 2009 | 006-05-0087 | US 90 | Chef Menteur Bridge Fender System | Fender System Repairs | $1,000,000 to $2,500,000 | 0.10 | Drake, Bill | |
| St. Tammany | Dec 2009 | 013-10-0044 | US 190 | 3.14 Mi.E.Of La 1077-w. Jct.Us190 B | Mill and Overlay | $250,000 to $500,000 | 1.20 | Chenevert, Mark | |
| Rapides | Dec 2009 | 014-06-0039 | US 165 | Woodworth Sidewalk Imp., Phase 2 | Sidewalk Improvements | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| Madison | Dec 2009 | 020-06-0038 | US 65 | Walnut Bayou - US 80 | Asph1-mill | $1,000,000 to $2,500,000 | 0.99 | Chenevert, Mark | |
| Red River | Dec 2009 | 021-05-0052 | US 84 | La 480 - US 71 | Cold Plane and Overlay | $250,000 to $500,000 | 1.05 | Chenevert, Mark | |
| Rapides | Dec 2009 | 023-01-0063 | US 167 | La 107 Bridges Guardrail Rehab | 0.9 Miles Guardrail Rehab On US 167 | $500,000 to $1,000,000 | 0.01 | Hicks, Melvin | |
| Rapides | Dec 2009 | 023-01-0066 | US 167 | Br.Expansion Jt Replacement(Us 167) | Bridge Expansion Joint Replacement | $0 to $100,000 | 0.01 | Choate, Rodney | |
| Sabine | Dec 2009 | 025-04-0027 | US 171 | Br.Expansion Jt. Replacemet(Us 171) | Bridge Expansion Joint Replacement | $0 to $100,000 | 0.01 | Choate, Rodney | |
| Caddo | Dec 2009 | 025-08-0065 | US 171 | Boggy Bayou Scour Repair | Scour Repair | $100,000 to $250,000 | 0.05 | Guidry, Chris | |
| Claiborne | Dec 2009 | 027-06-0032 | US 79 | Bayou D'arbonne Bridge | Scour Repair | $100,000 to $250,000 | 0.01 | Guidry, Chris | |
| Cameron | Dec 2009 | 031-01-0069 | LA 27 | Cameron Ferry - Holly Beach | Patch, Cold Plane, and Overlay | $2,500,000 to $5,000,000 | 7.90 | Chenevert, Mark | |
| Caddo | Dec 2009 | 053-09-0079 | LA 1 | La 1 @ La 526 Turn Lane Improvement | Add Nb and Sb Dual Left Turn Lanes | $250,000 to $500,000 | 0.14 | Baugh, Sam | |
| Cameron | Dec 2009 | 055-02-0005 | LA 14 | La 14 (Cslm 0.00 - Cslm 2.45) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.45 | Chenevert, Mark | |
| Vermilion | Dec 2009 | 055-06-0081 | LA 14 | La 82 - La 338 (Drr) | Patch and Overlay | $500,000 to $1,000,000 | 1.42 | Chenevert, Mark | |
| Evangeline | Dec 2009 | 057-06-0025 | LA 13 | La 10 - La 106 | Chipseal Double | $250,000 to $500,000 | 6.82 | Broadbent, Ronald | |
| St. Tammany | Dec 2009 | 058-01-0027 | LA 41 | La 36 - North 1.2 Mi Of Jct La 36 | Mill and Overlay | $100,000 to $250,000 | 1.20 | Chenevert, Mark | |
| Bienville | Dec 2009 | 067-01-0025 | LA 4 | Us 71 to Log Mile 9.996 | Asphaltic Concrete Widen &resurface | $2,500,000 to $5,000,000 | 10.00 | Chenevert, Mark | |
| Caddo | Dec 2009 | 094-01-0044 | LA 173 | La 173 Turn Lane | Add Nb Turn Lane On La 173 | $100,000 to $250,000 | 0.09 | Baugh, Sam | |
| DeSoto | Dec 2009 | 098-01-0007 | LA 172 | Texas State Line - Jct La 5 | 3.5"ac Overlay Agg Shoulders | $2,500,000 to $5,000,000 | 8.50 | Chenevert, Mark | |
| Concordia | Dec 2009 | 178-02-0021 | LA 129 | Workinger Bayou - US 84 | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 7.17 | Chenevert, Mark | |
| Vermilion | Dec 2009 | 194-07-0063 | LA 82 | La 333 - La 14 (Drr) | Patch and Overlay | $1,000,000 to $2,500,000 | 10.00 | Chenevert, Mark | |
| Acadia | Dec 2009 | 207-06-0010 | LA 342 | Lafayette Ph.Line - La 35 | Stabalize Base and Overlay | $250,000 to $500,000 | 0.64 | Chenevert, Mark | |
| Lafayette | Dec 2009 | 213-05-0035 | LA 92 | Roundabout At Int. Of La 339 & La92 | Roundabouts | $500,000 to $1,000,000 | 0.06 | Draughon, Steve | |
| St. Martin | Dec 2009 | 238-03-0046 | LA 96 | 0.3 Mi E Of Jct La 347 - Jct La 345 | Patch and Overlay | $100,000 to $250,000 | 0.90 | Chenevert, Mark | |
| Terrebonne | Dec 2009 | 246-01-0069 | LA 57 | 7.2 M N Of La 3011 -1.5 M N Of 3011 | Patch & Overlay | $1,000,000 to $2,500,000 | 5.70 | Chenevert, Mark | |
| Tangipahoa | Dec 2009 | 262-07-0026 | LA 16 | End Of Conc Section On La 16-us 51 | Mill and Overlay | $500,000 to $1,000,000 | 1.28 | Chenevert, Mark | |
| Jefferson | Dec 2009 | 283-30-0026 | LA 49 | Williams Blvd.(U Pass I-10 - US 61) | Patch, Clod Plane & Overlay | $1,000,000 to $2,500,000 | 1.90 | Chenevert, Mark | |
| Sabine | Dec 2009 | 357-01-0017 | LA 473 | La 191 - Vernon Parish Line | Patch (Moderate) and Chipseal | $500,000 to $1,000,000 | 7.18 | Chenevert, Mark | |
| St. Martin | Dec 2009 | 400-04-0012 | LA 347 | La 347 (La 96 - 0.7 Mi N) | Patch and Overlay | $100,000 to $250,000 | 0.70 | Chenevert, Mark | |
| Orleans | Dec 2009 | 410-01-0034 | LA 428 | General Degaulle @ Wall Blvd | Drainage Improvements | $20,000,000 to $30,000,000 | 0.01 | Rojas, Brittany | |
| East Baton Rouge | Dec 2009 | 414-01-0041 | LA 30 | La 73-500' South Of La 327 | Mill and Overlay | $1,000,000 to $2,500,000 | 2.22 | Beauvais, Hewitt | |
| Lafayette | Dec 2009 | 424-02-0088 | US 90 | Pinhook to Broussard | Widen From 4 to 6 Lanes | $20,000,000 to $30,000,000 | 7.19 | Draughon, Steve | |
| Lafourche | Dec 2009 | 424-08-0035 | US 90 | South Service Rd At La 1 | Minor Overlay | $100,000 to $250,000 | 0.50 | Broadbent, Ronald | |
| St. James | Dec 2009 | 426-31-0013 | LA3125 | Left Turn Lanes On La3125 @ La3274 | Traffic Flow Imp/Left Turn Lanes | $250,000 to $500,000 | 0.38 | Drake, Bill | |
| Lafayette | Dec 2009 | 433-01-0004 | LA3168 | La 93 - US 90 | Chipseal Double | $0 to $100,000 | 0.67 | Broadbent, Ronald | |
| Bienville | Dec 2009 | 451-04-0052 | I 20 | Bear Creek Relief Bridges | Scour Repair East & West Bound Lane | $100,000 to $250,000 | 1.00 | Guidry, Chris | |
| Ouachita | Dec 2009 | 451-06-0142 | I 20 | I20 @ US 165 Inter-ramp "h" Improve | Modify Cross Slope/Raise Bridg Rail | $250,000 to $500,000 | 0.20 | Fossier, Paul | |
| Rapides | Dec 2009 | 455-05-0121 | I 49 | Br.Expansion Jt. Replacement(I-49) | Bridge Expansion Joint Replacement | $100,000 to $250,000 | 0.01 | Choate, Rodney | |
| Iberville | Dec 2009 | 650-06-0021 | M/V Ascension | Replace Main Engine Reduction Gears | $500,000 to $1,000,000 | 0.00 | Reed, Kevin | ||
| Tangipahoa | Dec 2009 | 690-29-0008 | I 55 | Kentwood Weigh Station Rehab. | Demo.,Const. and Pit Scale Rehab | $2,500,000 to $5,000,000 | 0.01 | Fletcher, Curtis | |
| Lincoln | Dec 2009 | 695-02-0009 | I 20 | Tremont Rest Area (West Bound) | Reconstruct Rest Area | $1,000,000 to $2,500,000 | 0.01 | Fletcher, Curtis | |
| Orleans | Dec 2009 | 704-36-0045 | Magazine St.(Us 90.B.-.Nashville) | Rehab (Phase 1 Srp) | $2,500,000 to $5,000,000 | 0.00 | Burst, Jeffery | ||
| Allen | Dec 2009 | 713-02-0129 | Arkadelphia Rd Bridge | Bridge Replacement Auth | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Concordia | Dec 2009 | 713-15-0101 | Turtle Lake Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Rapides | Dec 2009 | 737-40-0104 | I 49 | Rapides - Impact Attenuator Upgrade | Replace Exist Impact Attenuators | $500,000 to $1,000,000 | 0.01 | Hicks, Melvin | |
| Terrebonne | Dec 2009 | 737-55-0003 | Houma ITS Phase 3 | Its Emergency Ope | $1,000,000 to $2,500,000 | 0.00 | Delaney, Elizabeth | ||
| Statewide | Dec 2009 | 737-99-1059 | I 12 | I-12 Ramp Metering Ebr & Liv Parish | Electrical & Communications Install | $250,000 to $500,000 | 0.01 | Delaney, Elizabeth | |
| Calcasieu | Dec 2009 | 742-10-0114 | Elliot Rd @ Gauthier | Add Turn Lanes and Signals | $1,000,000 to $2,500,000 | 0.00 | Waguespack, Brent | Mar 2009 | |
| St. Tammany | Dec 2009 | 744-52-0042 | US 190 | Us190 Corridor Landscaping/Sidewalk | Landscaping and Sidewalks | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| Iberia | Dec 2009 | 823-15-0017 | LA 677 | La 677 (La 31 - Cslm 1.4) | Patch and Overlay | $100,000 to $250,000 | 0.80 | Chenevert, Mark | |
| Iberville | Dec 2009 | 824-02-0014 | LA 75 | Milly Canal Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.20 | Vaught, Paul | Mar 2005 |
| Iberville | Dec 2009 | 824-06-0024 | LA 405 | 713' S Of Stewart St-1.24 Mi S La 1 | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 5.82 | Chenevert, Mark | |
| Iberville | Dec 2009 | 824-06-0025 | LA 405 | 1.24 Miles South Of La 1 - La 1 | Stabilize and Overlay | $500,000 to $1,000,000 | 1.24 | Chenevert, Mark | |
| St. Tammany | Dec 2009 | 852-21-0046 | LA 433 | 3.40 Mi S.Of US 190-1.06 Mi N US 11 | Mill and Overlay | $250,000 to $500,000 | 2.00 | Chenevert, Mark | |
| St. Tammany | Dec 2009 | 852-26-0022 | LA1090 | 0.15 Mi.N. Of US 190 - I-59 Ramps | Mill and Overlay | $500,000 to $1,000,000 | 4.30 | Chenevert, Mark | |
| Bossier | Jan 2010 | 001-03-0082 | US 80 | Bpcc Gateway Signs | New Campus Entrance Signs | $250,000 to $500,000 | 0.16 | Horton, Valerie | |
| Webster | Jan 2010 | 001-04-0037 | US 80 | Us 80 (Bossier Ph Line-l.M.4.84) | Chip Seal | $100,000 to $250,000 | 4.84 | Broadbent, Ronald | |
| Ouachita | Jan 2010 | 001-09-0075 | US 80 | Louisville Bridge | Rehabilitation (Phase Ii) | $7,500,000 to $10,000,000 | 0.60 | Kemp, Kelly | |
| Orleans | Jan 2010 | 006-03-0058 | US 90 | S Carrollton Ave-w End US 90b/I-1o | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 2.77 | Chenevert, Mark | |
| Allen | Jan 2010 | 014-04-0052 | US 165 | Safety Imp US 165 At Boise Cascade | Intersection Improvement/Turn Lane | $500,000 to $1,000,000 | 0.28 | Picard, Toby | |
| Rapides | Jan 2010 | 015-02-0022 | US 165 | Flagon Bayou Scour Repair | Scour Repair | $100,000 to $250,000 | 0.03 | Guidry, Chris | |
| Grant | Jan 2010 | 015-04-0061 | US 165 | Bear Creek Scour Repair | Scour Repair | $100,000 to $250,000 | 0.04 | Guidry, Chris | |
| East Baton Rouge | Jan 2010 | 019-02-0053 | US 61 | Us 61 @ La 3113 | Right Turn Lane | $100,000 to $250,000 | 0.12 | Drake, Bill | |
| East Baton Rouge | Jan 2010 | 019-30-0022 | LA 964 | Nb Right Turn Lane On La 964 | Add Nb Right Turn Lane | $100,000 to $250,000 | 0.10 | Drake, Bill | |
| Rapides | Jan 2010 | 022-03-0051 | US 165 | Dugdemona River Scour Repair | Scour Repair | $100,000 to $250,000 | 0.03 | Guidry, Chris | |
| Caddo | Jan 2010 | 025-09-0005 | LA3094 | Twelve Mile Bayou Bridge Rehab. | Bridge Rehab. | $1,000,000 to $2,500,000 | 0.11 | Bucci, Mark | |
| Catahoula | Jan 2010 | 026-04-0031 | US 425 | Tensas River Approach Slab | Leveling and Patching | $0 to $100,000 | 0.10 | Broadbent, Ronald | |
| Natchitoches | Jan 2010 | 034-05-0033 | LA 6 | Young Bayou Scour Repair | Scour Repair | $100,000 to $250,000 | 0.02 | Guidry, Chris | |
| Washington | Jan 2010 | 047-02-0033 | LA 10 | La 10 Left Turnlane In Franklinton | Construct Lt Turnlane | $100,000 to $250,000 | 0.17 | Drake, Bill | |
| Caddo | Jan 2010 | 053-09-0080 | LA 1 | West Service Road (Of La 1) | Chip Seal | $0 to $100,000 | 2.60 | Broadbent, Ronald | |
| Vermilion | Jan 2010 | 057-01-0007 | LA 13 | La 14 - 2.7 Mi.N. Of La 14 (Drr) | Patch and Overlay | $500,000 to $1,000,000 | 2.70 | Chenevert, Mark | |
| Acadia | Jan 2010 | 057-02-0030 | LA 13 | 0.2mi.N.Vermilion-1.15mi.N.La92(Drr | Patch and Overlay | $500,000 to $1,000,000 | 4.10 | Chenevert, Mark | |
| West Feliciana | Jan 2010 | 061-04-0060 | LA 10 | La 10 and La 3057 Repair Structure | Repair Drainage Outfall Structure | $250,000 to $500,000 | 0.01 | Nilforoushan, Mehdi | |
| St. Helena | Jan 2010 | 061-08-0016 | LA 10 | .29mi E.Of La 441 - Tangipahoa P.L. | Mill and Overlay | $250,000 to $500,000 | 2.60 | Chenevert, Mark | |
| St. Helena | Jan 2010 | 061-08-0017 | LA 10 | Jct La 441 - .29 M East Jct La 441 | Surface Preparation and Overlay | $0 to $100,000 | 0.29 | Chenevert, Mark | |
| Tangipahoa | Jan 2010 | 061-09-0017 | LA 10 | St Helena P/L - Jct US 51 | Surface Preparation and Overlay | $250,000 to $500,000 | 3.29 | Chenevert, Mark | |
| Lafourche | Jan 2010 | 064-06-0047 | LA 1 | Lockport Repairs | Repair Limit Switch/Span Lock/Gate | $250,000 to $500,000 | 0.01 | Berner, Darrick | |
| Terrebonne | Jan 2010 | 065-91-0035 | LA 24 | Bourg Bridge (Company Canal) | Remove & Replace Gate Arm Operators | $100,000 to $250,000 | 0.01 | Berner, Darrick | |
| Claiborne | Jan 2010 | 072-02-0012 | LA 9 | La 9 (Lm 5.58 - Union Ph. Line) | Chip Seal | $100,000 to $250,000 | 4.91 | Broadbent, Ronald | |
| Concordia | Jan 2010 | 075-01-0027 | LA 568 | Us 425 - 1st. Street | Pcc Patching | $0 to $100,000 | 0.21 | Broadbent, Ronald | |
| Caddo | Jan 2010 | 078-03-0022 | LA 538 | North Junction La 530 - La 1 | Chip Seal | $100,000 to $250,000 | 3.47 | Broadbent, Ronald | |
| Vermilion | Jan 2010 | 080-01-0032 | US 167 | 0.58 M N La 14 Bypass-laf P/L (Drr) | Cold Plane,Patch & Functional O'lay | $2,500,000 to $5,000,000 | 9.40 | Chenevert, Mark | |
| Red River | Jan 2010 | 100-01-0023 | LA 514 | La 514 (Us 71 - US 371) | Chip Seal | $250,000 to $500,000 | 6.88 | Broadbent, Ronald | |
| Franklin | Jan 2010 | 169-01-0026 | LA 130 | Polk Street - La 135 | Chip Seal Single | $250,000 to $500,000 | 6.71 | Broadbent, Ronald | |
| Franklin | Jan 2010 | 169-01-0027 | LA 130 | La 425 - Polk Street | Minor Overlay | $100,000 to $250,000 | 0.60 | Broadbent, Ronald | |
| Madison | Jan 2010 | 182-01-0017 | LA 602 | W.Jct US 80 - Montrose Road. | Chip Seal - Dbl | $250,000 to $500,000 | 5.03 | Broadbent, Ronald | |
| Calcasieu | Jan 2010 | 195-04-0021 | LA 385 | La 385 @ La 1138-2 In L.C. | Reconstruction | $1,000,000 to $2,500,000 | 0.10 | Waguespack, Brent | Oct 2008 |
| Vermilion | Jan 2010 | 213-04-0007 | LA 92 | S Jct US 167 - Lafayette P/L | Patch and Functional Overlay | $500,000 to $1,000,000 | 2.78 | Chenevert, Mark | |
| Pointe Coupee | Jan 2010 | 222-03-0010 | LA 973 | La 937 Drainage Improvements | Drainage Improvements | $0 to $100,000 | 0.01 | Nilforoushan, Mehdi | |
| Terrebonne | Jan 2010 | 247-02-0035 | LA 56 | La56(N End Boudreaux Canal Br-la 58 | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.16 | Chenevert, Mark | |
| Jefferson | Jan 2010 | 249-90-0042 | LA 45 | Jean Lafitte (La 3134-pipeline St) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 4.30 | Chenevert, Mark | |
| Ascension | Jan 2010 | 260-01-0020 | LA 42 | Amite River Relief Bridge | Bridge Replacement | $2,500,000 to $5,000,000 | 0.40 | Guidry, Chris | Feb 2009 |
| St. Charles | Jan 2010 | 282-02-0048 | LA 48 | Turn Lane Imp Near Schexnaydre Lane | Turn Lane Improvement | $100,000 to $250,000 | 0.30 | Drake, Bill | |
| Caddo | Jan 2010 | 297-03-0013 | LA 1690 | Four Forks to La 789 | Asphaltic Concrete Widen &resurface | $2,500,000 to $5,000,000 | 5.86 | Chenevert, Mark | |
| Vermilion | Jan 2010 | 385-05-0011 | LA 92 | Acadia P/L - Jct La 35 (Drr) | Patch and Overlay | $500,000 to $1,000,000 | 3.18 | Chenevert, Mark | |
| Vermilion | Jan 2010 | 393-02-0006 | LA 343 | La 699 - La 92 (Drr) | Patch and Overlay | $250,000 to $500,000 | 2.00 | Chenevert, Mark | |
| Lafayette | Jan 2010 | 393-03-0018 | LA 343 | 1.0mi.N.La 342-.05mi.S.Us 90 (Drr) | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 3.70 | Chenevert, Mark | |
| Lafourche | Jan 2010 | 412-03-0014 | LA 316 | N End Us90 Exit Ramp -terrebonne Pl | Patch, Cold Plane & Overlay | $250,000 to $500,000 | 1.04 | Chenevert, Mark | |
| Iberia | Jan 2010 | 424-04-0032 | US 90 | Us 90 @ La 85 | Overpass | $30,000,000 to $50,000,000 | 1.17 | Reviere, Ryan | |
| Iberville | Jan 2010 | 450-07-0089 | I 10 | I-10 Wb (La 77 Overpass) | Bridge Recondition/Replace Deck Jts | $0 to $100,000 | 0.27 | Beauvais, Hewitt | |
| East Baton Rouge | Jan 2010 | 450-10-0159 | I 10 | I-10 Widening (Siegen-highland) | Widening Design-build | $50,000,000 to $70,000,000 | 2.00 | Burst, Jeffery | |
| East Baton Rouge | Jan 2010 | 450-92-0055 | I 110 | I-110 (Badley Road Overpass) | Bridge Recondition | $500,000 to $1,000,000 | 0.01 | Beauvais, Hewitt | |
| Lincoln | Jan 2010 | 451-05-0114 | I 20 | West Choudrant Creek | Bridge Scour Repair | $250,000 to $500,000 | 0.01 | Guidry, Chris | |
| Ouachita | Jan 2010 | 713-37-0123 | Richardson Road Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| East Baton Rouge | Jan 2010 | 742-17-0153 | S.Harrell's Ferry @ S.Sherwood Blvd | Intersection Improvement | $1,000,000 to $2,500,000 | 0.00 | Riggs, Laura | ||
| Jefferson | Jan 2010 | 742-26-0066 | Segnette Blvd.(Lapalco Blvd-us 90b) | Overlay | $2,500,000 to $5,000,000 | 0.00 | Riggs, Laura | Nov 2008 | |
| Lafayette | Jan 2010 | 828-14-0027 | LA 733 | Jct. US 167 - Jct. La 92 | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 4.43 | Chenevert, Mark | |
| LaSalle | Jan 2010 | 830-15-0004 | LA 777 | La 127 - Nebo School | Chip Seal Single | $0 to $100,000 | 1.00 | Broadbent, Ronald | |
| LaSalle | Jan 2010 | 830-16-0009 | LA3071 | La 503 - La 459 | Chip Seal Single | $100,000 to $250,000 | 3.76 | Broadbent, Ronald | |
| Livingston | Jan 2010 | 832-10-0018 | LA1024 | La 16 - La 447 | C.P., Patch and Overlay | $2,500,000 to $5,000,000 | 5.44 | Chenevert, Mark | |
| Tangipahoa | Jan 2010 | 853-03-0010 | LA1051 | Beaver Creek Bridge | Bridge Scour Repair | $250,000 to $500,000 | 0.01 | Guidry, Chris | Oct 2009 |
| St. Charles | Feb 2010 | 005-08-0052 | US 90 | Us90(E Of B.Des All.-1.31m E La306) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.30 | Chenevert, Mark | |
| Evangeline | Feb 2010 | 012-10-0018 | US 190 | Acadia Ph Line - St.Landry Ph Line | Patch and Overlay | $5,000,000 to $7,500,000 | 7.65 | Chenevert, Mark | |
| St. Landry | Feb 2010 | 012-11-0036 | US 190 | Evangeline Ph Line - 1.00 Mi East | Patch and Overlay | $1,000,000 to $2,500,000 | 1.00 | Chenevert, Mark | |
| St. Tammany | Feb 2010 | 013-11-0038 | US 190 | Us 190 - Northpark Intersection Imp | Intersection Improvements | $500,000 to $1,000,000 | 0.38 | Waguespack, Brent | |
| St. Tammany | Feb 2010 | 018-30-0025 | LA 433 | La 433 @ Voters Rd | Intersection Improvements | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | |
| Lafayette | Feb 2010 | 032-01-0039 | LA 182 | .1mi.N.La 723 -.91mi.N.La 723 (Drr) | Stabilize Base and Overlay | $500,000 to $1,000,000 | 0.90 | Chenevert, Mark | |
| Lafayette | Feb 2010 | 032-01-0040 | LA 182 | I-49 Underpass - St.Landry P/L(Drr) | Patch and Overlay | $100,000 to $250,000 | 0.60 | Chenevert, Mark | |
| Sabine | Feb 2010 | 042-03-0010 | LA 120 | La 120 Flooding | Cross Drain Improvements | $100,000 to $250,000 | 0.01 | Nilforoushan, Mehdi | |
| St. Bernard | Feb 2010 | 046-03-0076 | LA 46 | St.Bernard Hwy Drain/Safety Imp Ph3 | Drainage/Safety Improvements | $1,000,000 to $2,500,000 | 0.01 | Riggs, Laura | |
| Jefferson Davis | Feb 2010 | 054-05-0024 | LA 26 | La 26 (Cslm 9.31 - Cslm 10.56) | Cold-plane,Patch,Stab Shlds,Overlay | $1,000,000 to $2,500,000 | 1.25 | Chenevert, Mark | |
| Acadia | Feb 2010 | 057-03-0051 | LA 13 | Long Point Gully Scour Repair | Scour Repair | $100,000 to $250,000 | 0.03 | Guidry, Chris | |
| St. Tammany | Feb 2010 | 059-01-0029 | LA 21 | La 21 @ Brewster Rd | Intersection Improvements | $2,500,000 to $5,000,000 | 0.01 | Waguespack, Brent | |
| Lafourche | Feb 2010 | 064-06-0048 | LA 1 | La 1 @ Control Sec 6406 | Intersection Improvements | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | |
| Lafourche | Feb 2010 | 064-06-0049 | LA 1 | La 1 Lighting and Signage Impr. | Lighting and Signing | $100,000 to $250,000 | 0.01 | Waguespack, Brent | |
| Lafourche | Feb 2010 | 064-07-0026 | LA 1 | Lafourche Parish Turning Lanes | Turning Lanes | $500,000 to $1,000,000 | 0.01 | Waguespack, Brent | |
| Assumption | Feb 2010 | 064-09-0013 | LA 1 | La 1 @ La 1247 Intersection Improv | Intersection Improvements | $100,000 to $250,000 | 0.01 | Waguespack, Brent | |
| Claiborne | Feb 2010 | 085-08-0031 | LA 146 | La 518 - Lincoln Ph. Line | Widen and Overlay | $1,000,000 to $2,500,000 | 5.24 | Chenevert, Mark | |
| DeSoto | Feb 2010 | 099-03-0012 | LA 191 | Northern Trailhead Project | Trailhead Sign, Lighting, Landscape | $100,000 to $250,000 | 0.01 | Horton, Valerie | |
| Tensas | Feb 2010 | 186-30-0009 | LA 573 | Cooter Point - 4 Miles North | Stabilize and Ast | $500,000 to $1,000,000 | 4.00 | Chenevert, Mark | |
| Tensas | Feb 2010 | 186-30-0010 | LA 573 | 4 Miles N Of Cooter Point - La 892 | Stabilize & Asphaltic Surface Treat | $250,000 to $500,000 | 3.93 | Chenevert, Mark | |
| Calcasieu | Feb 2010 | 187-01-0034 | LA 109 | La 109 (Line Rd - Van Meter Rd) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.90 | Chenevert, Mark | |
| Beauregard | Feb 2010 | 187-03-0011 | LA 109 | Calcasieu Ph.Ln.-lloyd Smith Cutoff | Chip Seal - Single | $0 to $100,000 | 1.78 | Broadbent, Ronald | |
| Beauregard | Feb 2010 | 190-01-0024 | LA 110 | La 110 (Cslm 2.2 - Cslm 5.3) | Overlay | $500,000 to $1,000,000 | 3.10 | Chenevert, Mark | |
| Calcasieu | Feb 2010 | 192-01-0014 | LA 108 | I-10 - Gum Cove Road | Chip Seal - Single | $100,000 to $250,000 | 6.03 | Broadbent, Ronald | |
| Evangeline | Feb 2010 | 203-02-0022 | LA 29 | Coulee De Manuel Scour Repair | Scour Repair | $100,000 to $250,000 | 0.02 | Guidry, Chris | |
| Lafayette | Feb 2010 | 213-05-0039 | LA 92 | Bonin Rd @ E Milton Ave (La 92) | Roundabout | $500,000 to $1,000,000 | 0.01 | Waguespack, Brent | |
| St. Mary | Feb 2010 | 243-02-0080 | LA 317 | La 317 (S.Side US 90 - La 182) | C.P.,Patch and Overlay | $500,000 to $1,000,000 | 0.98 | Chenevert, Mark | |
| Terrebonne | Feb 2010 | 245-02-0031 | LA 315 | La315(S.End Of La 315-.97m S La182) | O'lay;only Let When Get Hmgp$ | $1,000,000 to $2,500,000 | 9.78 | Chenevert, Mark | |
| Terrebonne | Feb 2010 | 245-90-0058 | LA 315 | La 315 S.Of Falgout Br-crozier Dr. | O'lay-only Let When Get Hmgp$ | $2,500,000 to $5,000,000 | 9.75 | Chenevert, Mark | |
| Livingston | Feb 2010 | 262-03-0017 | LA 16 | Denham Springs Historical District | Sidewalks, Electrical Conduit | $100,000 to $250,000 | 0.16 | Horton, Valerie | |
| Tangipahoa | Feb 2010 | 269-05-0020 | LA 442 | Jct. U.S. 51 - Jct.La 445 | Mill and Overlay | $1,000,000 to $2,500,000 | 11.24 | Chenevert, Mark | |
| Livingston | Feb 2010 | 272-04-0011 | LA 63 | La 1023 - La 16 | Mill and Overlay | $250,000 to $500,000 | 2.15 | Chenevert, Mark | |
| Washington | Feb 2010 | 274-02-0012 | LA 62 | .80mi.N.La 436-1.69mi.S.Of S.La 438 | Mill and Overlay | $500,000 to $1,000,000 | 3.20 | Chenevert, Mark | |
| Washington | Feb 2010 | 274-02-0013 | LA 62 | S.Jct. La 438 - N.Jct. La 438 | Mill and Overlay | $250,000 to $500,000 | 1.51 | Chenevert, Mark | |
| Washington | Feb 2010 | 274-02-0014 | LA 62 | La 436 - South Jct La 438 | Surface Prep and Overlay | $250,000 to $500,000 | 2.50 | Chenevert, Mark | |
| Washington | Feb 2010 | 274-30-0010 | LA 62 | N. Jct La 438-mississippi State Ln | Mill and Overlay | $250,000 to $500,000 | 1.71 | Chenevert, Mark | |
| Avoyelles | Feb 2010 | 374-03-0022 | LA 451 | Local Road - La 1 | Patch and Chip Seal | $1,000,000 to $2,500,000 | 18.53 | Chenevert, Mark | |
| Calcasieu | Feb 2010 | 381-01-0009 | LA 388 | Us 90 - Big Woods Cemetery | Chip Seal Single | $0 to $100,000 | 3.20 | Broadbent, Ronald | |
| Calcasieu | Feb 2010 | 382-04-0054 | LA 384 | La 384 (Black Bayou - Duke Road) | Patch, Overlay | $1,000,000 to $2,500,000 | 4.79 | Chenevert, Mark | |
| Lafourche | Feb 2010 | 407-04-0042 | LA 308 | La 308 (La 182-3 Miles W Of La 182) | Patch, Cold Plane & Overlay | $250,000 to $500,000 | 3.00 | Chenevert, Mark | |
| Tangipahoa | Feb 2010 | 415-04-0010 | LA1062 | La 40 - La 445 | Cold Plane, Base,Drainage & Overlay | $1,000,000 to $2,500,000 | 6.04 | Chenevert, Mark | |
| St. Charles | Feb 2010 | 450-36-0036 | I 310 | I-310 Pavement Marking Replacement | Pavement Markings | $250,000 to $500,000 | 0.01 | Allain, Peter | |
| St. Charles | Feb 2010 | 450-37-0023 | I 310 | I-310 Pavement Marking Replacement | Pavement Markings | $0 to $100,000 | 0.01 | Allain, Peter | |
| St. Charles | Feb 2010 | 450-38-0025 | I 310 | I-310 Pavement Marking Replacement | Pavement Markings | $0 to $100,000 | 0.01 | Allain, Peter | |
| Orleans | Feb 2010 | 450-90-0226 | I 10 | Near Franklin Ave - High Rise | Concrete Pavement Rehab & Overlay | $2,500,000 to $5,000,000 | 2.32 | Thomas, Ben | |
| Orleans | Feb 2010 | 450-90-0230 | I 10 | I-10 Fencing,Safety, Beautification | Landscaping and Fence Installation | $2,500,000 to $5,000,000 | 0.01 | Riggs, Laura | |
| Calcasieu | Feb 2010 | 450-91-0173 | I 10 | Pedestrian O'pass-la 108 | Cp & Overlay | $7,500,000 to $10,000,000 | 2.12 | Thomas, Ben | |
| Caddo | Feb 2010 | 451-01-0129 | I 20 | R.R. O'pass - Pines Rd.,Wb Outer Ln | Coldplane and Overlay | $250,000 to $500,000 | 4.20 | Thomas, Ben | |
| Bossier | Feb 2010 | 451-02-0094 | I 20 | I-20 Pavement Markings, Bossier | Pavement Markings | $100,000 to $250,000 | 0.01 | Allain, Peter | |
| Bienville | Feb 2010 | 451-04-0059 | I 20 | I-20 At La 154 Eb/Wb Accel Lane Ext | Extend Acceleration Lane/Exist Ramp | $250,000 to $500,000 | 0.73 | Baugh, Sam | |
| Ouachita | Feb 2010 | 451-06-0152 | I 20 | West Of La 34 - East Of Garrett Rd. | Rubblize and Overlay | $10,000,000 to $15,000,000 | 5.80 | Thomas, Ben | |
| Tangipahoa | Feb 2010 | 452-90-0152 | I 55 | La 1049 - Mississippi State Line | Rubbilize and Overlay | $15,000,000 to $20,000,000 | 5.07 | Thomas, Ben | |
| St. Tammany | Feb 2010 | 454-04-0082 | La 21 @ I-12 | Interchange Improvements | $7,500,000 to $10,000,000 | 0.68 | Waguespack, Brent | ||
| St. Landry | Feb 2010 | 455-02-0074 | I 49 | Jct US 190 - 0.7 Mi.Sof La 10 | Concrete Pvmt Rehab & Overlay | $2,500,000 to $5,000,000 | 7.70 | Thomas, Ben | |
| Bienville | Feb 2010 | 713-07-0103 | Pine Grove Road Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| St. Tammany | Feb 2010 | 713-52-0102 | Lake Road Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.01 | Pentek, Gary | ||
| Washington | Feb 2010 | 713-59-0220 | Dollar Rd Brdg Over Pushepatapa Crk | Bridge Replacement | $2,500,000 to $5,000,000 | 0.00 | Pentek, Gary | ||
| District 58 | Feb 2010 | 737-91-0030 | District 58 Various Routes | Bridge Joint Rehab | $100,000 to $250,000 | 0.00 | Mason, Ken | ||
| Caddo | Feb 2010 | 737-94-0030 | Shreveport Near-term ITS (Phase 3a) | S'port/Bossier ITS Near Term Phs 3a | $5,000,000 to $7,500,000 | 0.00 | Delaney, Elizabeth | ||
| Bossier | Feb 2010 | 742-08-0007 | Stockwell Road | Reconstruction and Rehabilitation | $1,000,000 to $2,500,000 | 2.10 | Riggs, Laura | ||
| Bossier | Feb 2010 | 742-08-0008 | Concrete Panel Rep.Green Acres Bv | Concrete Panel Replacement | $500,000 to $1,000,000 | 0.01 | Riggs, Laura | ||
| Caddo | Feb 2010 | 742-09-0109 | Woolworth Rd (Colquitt - S'port Cl) | Overlay | $500,000 to $1,000,000 | 0.01 | Riggs, Laura | ||
| Calcasieu | Feb 2010 | 742-10-0134 | Parish Rd (Ruth to Picard) Sulphur | Widen W/ Curb and Gutter | $2,500,000 to $5,000,000 | 0.00 | Waguespack, Brent | ||
| Calcasieu | Feb 2010 | 742-10-0142 | W Mcneese | Overlay | $250,000 to $500,000 | 0.52 | Waguespack, Brent | ||
| Calcasieu | Feb 2010 | 742-10-0143 | Weaver | Overlay | $500,000 to $1,000,000 | 2.05 | Waguespack, Brent | ||
| Calcasieu | Feb 2010 | 742-10-0145 | Hodges | Overlay | $250,000 to $500,000 | 1.13 | Waguespack, Brent | ||
| Jefferson | Feb 2010 | 742-26-0053 | Lapalco (Manhattan Blvd - B. Fatma) | Overlay | $1,000,000 to $2,500,000 | 0.34 | Riggs, Laura | ||
| Lafourche | Feb 2010 | 742-29-0004 | Tiger Dr Exten & Thibodaux Overlays | Overlay | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | ||
| Lafourche | Feb 2010 | 742-29-0009 | Acadia Road Pedestrain Walkway | Pedestain Walkway | $100,000 to $250,000 | 0.01 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0019 | Oliver Road | Overlay | $1,000,000 to $2,500,000 | 0.00 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0020 | Overlays In West Monroe | Overlay | $2,500,000 to $5,000,000 | 0.00 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0021 | Good Hope Road | Overlay | $500,000 to $1,000,000 | 0.78 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0022 | Dellwood Dr (S1) US 165 - Blackwood | Overlay | $500,000 to $1,000,000 | 0.54 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0023 | Louisiana (Wallace D.Rd-wallace Rd) | Overlay | $100,000 to $250,000 | 0.25 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0024 | Vancil Road | Overlay | $1,000,000 to $2,500,000 | 1.18 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0025 | Hadley Street | Overlay | $250,000 to $500,000 | 0.48 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0026 | Washington Street | Overlay | $500,000 to $1,000,000 | 0.88 | Waguespack, Brent | ||
| Ouachita | Feb 2010 | 742-37-0027 | Riverside Drive | Overlay | $250,000 to $500,000 | 1.37 | Waguespack, Brent | ||
| Terrebonne | Feb 2010 | 742-55-0110 | Terrebonne Parish Overlays | Overlays | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | ||
| Terrebonne | Feb 2010 | 742-55-0111 | Terrebonne Ph Concrete Sec. Repairs | Concrete Repairs | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | ||
| Terrebonne | Feb 2010 | 742-55-0112 | Terrebonne Parish Turn Lanes | 12 Intersection Turn Lanes In Ph. | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | ||
| Assumption | Feb 2010 | 804-15-0019 | LA 398 | La 398 @ La 1010 Intersection Imp | Intersection & Geometric Improvmnts | $0 to $100,000 | 0.01 | Waguespack, Brent | |
| Calcasieu | Feb 2010 | 810-24-0048 | US 90X | Broad Street | Overlay | $1,000,000 to $2,500,000 | 2.00 | Waguespack, Brent | |
| Catahoula | Feb 2010 | 813-27-0006 | LA 927 | Us 84 - La 124 | Stabilize and Overlay | $500,000 to $1,000,000 | 0.93 | Chenevert, Mark | |
| Jefferson Davis | Feb 2010 | 827-17-0019 | LA 102 | La 26 - US 90 | Chip Seal - Single | $100,000 to $250,000 | 7.43 | Broadbent, Ronald | |
| Lafayette | Feb 2010 | 828-14-0026 | LA 733 | Anselm Coulee Scour Repair | Scour Repair | $100,000 to $250,000 | 0.02 | Guidry, Chris | |
| St. Helena | Feb 2010 | 846-01-0009 | LA1036 | Livingston Ph. Line - N.Jct La 441 | Cold Plane,Patch & Overlay | $1,000,000 to $2,500,000 | 4.33 | Chenevert, Mark | |
| St. John Baptist | Feb 2010 | 848-07-0013 | La 628 Turn Lane | Intersection Improvement | $500,000 to $1,000,000 | 0.00 | Musa, Elnur | Nov 2009 | |
| St. Martin | Feb 2010 | 850-20-0006 | LA 680 | Iberia Ph. Line - La 347 | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 2.98 | Chenevert, Mark | |
| St. Tammany | Feb 2010 | 852-25-0017 | LA1091 | La 1091 @ Brownswitch Rd | Intersection Improvements | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | |
| St. Tammany | Feb 2010 | 852-26-0017 | LA1090 | La 1090 @ Brownswitch Road | Intersection Improvements | $500,000 to $1,000,000 | 0.19 | Waguespack, Brent | |
| St. Tammany | Feb 2010 | 852-26-0021 | US 11 | Us 11 @ Cleo Road | Intersection Improvements | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | |
| St. Charles | Mar 2010 | 007-03-0057 | US 61 | W End Of La 310 Ent Ramp-st John Pl | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 7.09 | Chenevert, Mark | |
| Pointe Coupee | Mar 2010 | 008-02-0032 | US 190 | Left Turn Lanes @ La77 & La 78/411 | Turn Lanes | $7,500,000 to $10,000,000 | 1.00 | Guidry, Chris | Oct 2005 |
| Pointe Coupee | Mar 2010 | 008-03-0056 | US 190 | Us 190 Morganza Floodway Bridge | Bridge Repair | $7,500,000 to $10,000,000 | 3.55 | Fossier, Paul | |
| West Baton Rouge | Mar 2010 | 050-07-0075 | LA 1 | La 1 Nb Acceleration Lane@ Emily Dr | Add Nb Acceleration Lane | $250,000 to $500,000 | 0.01 | Riggs, Laura | |
| Jefferson | Mar 2010 | 063-02-0048 | LA 18 | La 18(4th St.Ext.-burmaster(Gretna) | Construct 2 Lanes Se Funds | $5,000,000 to $7,500,000 | 1.73 | Riggs, Laura | |
| Jefferson | Mar 2010 | 063-04-0039 | LA 18 | La 18 (Avondale - St.Charles Ph Ln | Drainage Improvements | $250,000 to $500,000 | 6.97 | Nilforoushan, Mehdi | |
| St. Charles | Mar 2010 | 063-05-0026 | LA 18 | La 18 (Jefferson Ph.Line - La 52) | Cold Plane and Overlay | $2,500,000 to $5,000,000 | 6.08 | Chenevert, Mark | |
| St. Charles | Mar 2010 | 063-05-0027 | LA 18 | River Rd. (Jefferson P/L - La 52) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.10 | Chenevert, Mark | |
| East Baton Rouge | Mar 2010 | 077-05-0043 | Br Computer Sig. Sync Ph V Part a | Signal Synchronization @ 47 Ints. | $5,000,000 to $7,500,000 | 0.00 | Riggs, Laura | ||
| Webster | Mar 2010 | 083-06-0037 | LA 2 | Bodcau Bayou Bridge On La 2 | Bridge Replacement | $2,500,000 to $5,000,000 | 0.77 | Brauner, Kurt | Dec 2008 |
| Claiborne | Mar 2010 | 085-07-0014 | LA 2 | Homer Bypass Paving | (Needs State Funding) | $10,000,000 to $15,000,000 | 3.91 | Guest, Debra | |
| Caddo | Mar 2010 | 102-02-0042 | LA 511 | La 511 Street Lighting | Add Street Lighting At La 511 & 526 | $0 to $100,000 | 0.23 | Baugh, Sam | |
| Sabine | Mar 2010 | 117-02-0014 | LA 118 | Peason - Natchitoches Pr. Line | Ctb & Overlay | $1,000,000 to $2,500,000 | 3.17 | Chenevert, Mark | |
| Allen | Mar 2010 | 139-01-0013 | LA 113 | La 113 (Cslm 0.0 - Cslm 1.8) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 1.80 | Chenevert, Mark | |
| Beauregard | Mar 2010 | 139-02-0014 | LA 113 | La 113 (Cslm 0.0 - Cslm 4.0) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 4.00 | Chenevert, Mark | |
| Beauregard | Mar 2010 | 139-03-0019 | LA 113 | La 113 (Cslm 4.3 - Cslm 7.2) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.90 | Chenevert, Mark | |
| Beauregard | Mar 2010 | 190-02-0020 | LA 110 | La 110 (Cslm 4.6 - Cslm 11.3) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.70 | Chenevert, Mark | |
| Jefferson Davis | Mar 2010 | 198-02-0022 | LA 99 | La 380 - US 90 | Base Reconstruction & Overlay | $5,000,000 to $7,500,000 | 9.70 | Chenevert, Mark | |
| East Baton Rouge | Mar 2010 | 254-02-0051 | LA 37 | La 37 At Central Thruway | New 2 Lanes (Concrete Pavement) | $5,000,000 to $7,500,000 | 0.27 | Riggs, Laura | |
| Ascension | Mar 2010 | 266-02-0025 | LA 22 | W.B. Left Turn Lane At US 61 | Turn Lanes | $250,000 to $500,000 | 0.19 | Drake, Bill | |
| St. Tammany | Mar 2010 | 281-04-0025 | LA 435 | Abita Springs Sidewalk Program | New Sidewalks | $100,000 to $250,000 | 0.01 | Horton, Valerie | |
| Sabine | Mar 2010 | 300-01-0009 | LA 483 | Us 171 - W. Jct La 174 | Ctb and Chipseal | $2,500,000 to $5,000,000 | 4.79 | Chenevert, Mark | |
| Winn | Mar 2010 | 321-01-0015 | LA 505 | Us 167 - La 126 | Chip Seal | $500,000 to $1,000,000 | 11.90 | Broadbent, Ronald | |
| Calcasieu | Mar 2010 | 450-30-0076 | I 210 | I-210 Prien Lake Pier | Prien Lake Pier Protection Rehab | $30,000,000 to $50,000,000 | 0.01 | Fossier, Paul | |
| Webster | Mar 2010 | 451-03-0069 | I 20 | I-20 Bossier Ph/L - Bienville P/L | Pavement Marking Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Bienville | Mar 2010 | 451-04-0062 | I 20 | I-20 Webster P/L - .35 Mi.E.La 154 | Pavement Marking Replacement | $100,000 to $250,000 | 0.01 | Allain, Peter | |
| Ouachita | Mar 2010 | 451-06-0157 | I 20 | I-20(.5mi.E.Garrett Rd.-richlandpl | Pavement Marking Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Richland | Mar 2010 | 451-07-0072 | I 20 | I-20(.18mi.E.La 609-madison P/L) | Pavement Marker Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Richland | Mar 2010 | 451-07-0073 | I 20 | I-20 (Ouachita P/L-.18mi.E.La 609) | Pavement Marking Replacement | $100,000 to $250,000 | 0.01 | Allain, Peter | |
| Madison | Mar 2010 | 451-08-0081 | I 20 | I-20(1.88mi.E.La 577-us 65 U'pass) | Pavement Marker Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| St. Tammany | Mar 2010 | 453-01-0060 | I 59 | I-59(I-10 - S.W.End Of Pearl R.Br.) | Pavement Marker Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| St. Tammany | Mar 2010 | 453-02-0006 | I 59 | I-59 (S.W. End Pearl R.Br.-miss.Ln. | I-59 Pavement Marking Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Rapides | Mar 2010 | 455-05-0124 | I 20 | I-49 .10mi.S.Of La1-natchitoches Pl | Pavement Marking Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Natchitoches | Mar 2010 | 455-06-0058 | I 49 | I-49(Rapides P/L-.10mi. S.La 485) | Pavement Marker Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Caddo | Mar 2010 | 455-09-0005 | I 49 | I-49 North (La 530 - La 170) Seg F | New Interstate | $20,000,000 to $30,000,000 | 3.29 | Umeozulu, Joe | Sep 2009 |
| Caddo | Mar 2010 | 455-09-0011 | I 49 | I-49 North (La 169 - La 530) Seg G | New Interstate | $30,000,000 to $50,000,000 | 4.78 | Umeozulu, Joe | Jun 2009 |
| Avoyelles | Mar 2010 | 713-05-0115 | Moreauville City Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Jackson | Mar 2010 | 713-25-0105 | Country Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Ouachita | Mar 2010 | 713-37-0132 | Red Cut Road Bridge #1 & #2 | New Bridges | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Webster | Mar 2010 | 713-60-0013 | Nursery & Kings Orchard Road Brdgs. | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Ouachita | Mar 2010 | 742-06-0050 | Finks Hideaway (Us 165-holland) Ph1 | Widen to 5 Lanes | $5,000,000 to $7,500,000 | 1.91 | Borne, Fred | Dec 2009 | |
| Orleans | Mar 2010 | 742-36-0122 | Lakefront/Holy Cross Signal Improve | Signal Improvements | $1,000,000 to $2,500,000 | 0.00 | Riggs, Laura | ||
| Plaquemines | Mar 2010 | 838-03-0024 | LA 406 | Woodlawn Hwy Improvements Phase 2 | Asp Widen and Overlay | $1,000,000 to $2,500,000 | 1.92 | Riggs, Laura | |
| St. Charles | Mar 2010 | 845-09-0008 | LA 632 | Main Canal Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.30 | Bucci, Mark | Jun 2009 |
| Vermilion | Mar 2010 | 857-66-0014 | LA3147 | Humble Canal Bridge | New Hydraulic Winch System | $250,000 to $500,000 | 0.01 | Harter, John | |
| Washington | Mar 2010 | 859-09-0020 | LA 430 | Hurricane Katrina Debris Routes | Mill and Overlay | $1,000,000 to $2,500,000 | 6.40 | Chenevert, Mark | |
| Natchitoches | Apr 2010 | 010-01-0024 | US 71 | Us 71 @ Fairview Elementry School | Turn Lane | $500,000 to $1,000,000 | 0.50 | Hicks, Melvin | |
| Plaquemines | Apr 2010 | 062-05-0042 | LA 23 | La 23 (Near Empire) | Drainage Improvements | $250,000 to $500,000 | 0.54 | Nilforoushan, Mehdi | |
| Plaquemines | Apr 2010 | 062-05-0043 | LA 23 | La 23 (.3 M N Of RR Spur - 2.6 M N) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 1.30 | Chenevert, Mark | |
| Plaquemines | Apr 2010 | 062-05-0044 | LA 23 | La 23(3.48m S Doullut Canal -buras) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 1.80 | Chenevert, Mark | |
| Plaquemines | Apr 2010 | 062-06-0035 | LA 23 | Jct Buras Rd - 5.4 M S Of Jct | Patch, Cold Plane & Overlay | $7,500,000 to $10,000,000 | 5.40 | Chenevert, Mark | |
| Caddo | Apr 2010 | 094-01-0045 | LA 173 | La 173 Improvements | Add Sb Acceleration Lane | $250,000 to $500,000 | 0.06 | Baugh, Sam | |
| Natchitoches | Apr 2010 | 112-06-0008 | LA 174 | Ajax - I-49 | Curve Realignment | $1,000,000 to $2,500,000 | 1.90 | Moore, Darrell | Feb 2009 |
| Vermilion | Apr 2010 | 194-07-0062 | LA 82 | La 82 @ Vermillion River | Repair Pinion Gear | $0 to $100,000 | 0.01 | Berner, Darrick | |
| Jefferson Davis | Apr 2010 | 198-30-0007 | LA 99 | La 14 - La 380 | Patch & Overlay | $250,000 to $500,000 | 2.00 | Chenevert, Mark | |
| Jefferson Davis | Apr 2010 | 199-01-0011 | LA 102 | La 102 (Cslm 0.5 - Cslm 7.0) | Patch & Overlay | $1,000,000 to $2,500,000 | 6.50 | Chenevert, Mark | |
| Lafayette | Apr 2010 | 217-01-0017 | LA 98 | Roundabout La 98 and La 93 | Roundabout | $250,000 to $500,000 | 0.68 | Draughon, Steve | |
| Pointe Coupee | Apr 2010 | 219-04-0017 | LA 77 | Iberville Ph Line - US 90 | Stabilize and Overlay | $2,500,000 to $5,000,000 | 4.59 | Chenevert, Mark | |
| Tangipahoa | Apr 2010 | 261-04-0024 | LA 22 | La 22 (Ponchatoula Drainage Imp) | Drainage Improvements | $100,000 to $250,000 | 0.23 | Nilforoushan, Mehdi | |
| St. Mary | Apr 2010 | 408-02-0011 | LA 87 | La 322 - End Of Maintenance | Cold Plane, Patch and Overlay | $2,500,000 to $5,000,000 | 5.01 | Chenevert, Mark | |
| St. James | Apr 2010 | 426-31-0014 | LA3125 | W.B. Left Turn Lane At La 3193 | Turn Lane | $500,000 to $1,000,000 | 0.38 | Drake, Bill | |
| Jefferson | Apr 2010 | 430-01-0020 | LA3139 | Earhart At Dakin (Se Funds) | Ramp Connector (Eb Earhart - Dakin) | $1,000,000 to $2,500,000 | 1.00 | Riggs, Laura | |
| Bienville | Apr 2010 | 451-04-0058 | I 20 | I-20 @ La 151 Eb/Wb Accel Lane Ext | Extend Acceleration Lane/Exist Ramp | $250,000 to $500,000 | 0.63 | Baugh, Sam | |
| Livingston | Apr 2010 | 454-02-0071 | I 12 | Amite Bridge-pete's(Wb)-juban(Eb&wb | 6 Lane; Design-build | $30,000,000 to $50,000,000 | 2.08 | Burst, Jeffery | |
| Caddo | Apr 2010 | 455-09-0003 | I 49 | I-49 North (La 1 - La 173) Seg I | New Interstate | $50,000,000 to $70,000,000 | 5.53 | Umeozulu, Joe | Jan 2010 |
| Allen | Apr 2010 | 713-02-0121 | N Carpenter Road & 13th St Bridges | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| East Carroll | Apr 2010 | 713-18-0109 | Goat Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| East Feliciana | Apr 2010 | 713-19-0112 | Cheathams Run/Devalcourt Rd Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Vermilion | Apr 2010 | 713-57-0126 | Dennis Rd & Bluebonnet Rd Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| West Feliciana | Apr 2010 | 713-63-0103 | Harris Cornor Rd & Peterson Rd Brid | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Rapides | Apr 2010 | 737-40-0105 | City Of Alex. Sr2s Proj.(Rugg Elem) | Sidewalks/Traffic Calming | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Assumption | Apr 2010 | 742-04-0100 | Assumption Pr.Police Jury Sr2s | Sidewalks and Ped. Bridge Imp. | $250,000 to $500,000 | 0.00 | Parsons, Brian | ||
| Bossier | Apr 2010 | 742-08-0005 | Bossier Pr.School Board Sr2s Proj. | Sidewalks,Crossings,Bike Rack,Etc. | $250,000 to $500,000 | 0.00 | Parsons, Brian | ||
| Lafayette | Apr 2010 | 742-28-0003 | Lafayette Con.Gov. Sr2s Project | Sidewalks, Etc. | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Lafourche | Apr 2010 | 742-29-0002 | Town Of Lockport Sr2s Project | Sidewalks, Etc. | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Livingston | Apr 2010 | 742-32-0003 | Town Of Walker Sr2s Project | Sidewalks/Bicycle Trail, Etc. | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Ouachita | Apr 2010 | 742-37-0018 | Town Of Sterlington Sr2s Project | Sidewalks, Etc. | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| St. Landry | Apr 2010 | 742-49-0001 | Eunice Safe Routes to Schools | Sidewalks and Bike Rack | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Calcasieu | Apr 2010 | 810-25-0010 | LA3063 | La 109 - US 90 | Widen and Overlay | $2,500,000 to $5,000,000 | 4.34 | Chenevert, Mark | |
| Jefferson | Apr 2010 | 826-05-0016 | LA 541 | La 541(E.Jct La 18-bridge City Ave) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 4.32 | Chenevert, Mark | |
| Rapides | Apr 2010 | 840-43-0001 | US 71 | Ft. Buhlow Br (Us 71 / US 165) | Main Span | $100,000,000 to $125,000,000 | 1.42 | Umeozulu, Joe | Oct 2009 |
| St. Helena | Apr 2010 | 846-05-0009 | LA1045 | La 43 - Tangipahoa Parish Line | Chip Seal Single | $100,000 to $250,000 | 5.78 | Broadbent, Ronald | |
| St. Helena | Apr 2010 | 846-06-0006 | LA1046 | La 441 - La 1047 | Chip Seal Single | $0 to $100,000 | 2.80 | Broadbent, Ronald | |
| St. Tammany | Apr 2010 | 852-05-0007 | LA1077 | La 25 - La 1078 | Chip Seal Single | $100,000 to $250,000 | 4.31 | Broadbent, Ronald | |
| Tangipahoa | Apr 2010 | 853-01-0015 | LA1054 | Us 51 - La 1055 | Chip Seal Single | $0 to $100,000 | 3.87 | Broadbent, Ronald | |
| Tangipahoa | Apr 2010 | 853-07-0007 | LA1045 | St.Helena Ph. Line - La 16 | Chip Seal Single | $0 to $100,000 | 1.56 | Broadbent, Ronald | |
| Washington | Apr 2010 | 859-25-0011 | LA1055 | La 38 - La 438 | Chip Seal Single | $100,000 to $250,000 | 6.50 | Broadbent, Ronald |