DOTD is pleased to announce that a total of 26 projects were selected for funding this year for a total award of $6.1 million.
PROJECT NAME DIST. PARISH DESCRIPTION FED AMT REQUESTED
Jefferson Lakefront Linear Park Bike/Ped Path, Phase VI-A 2 Jefferson Construction of a 10' wide bike path and 6' wide pedestrian path along Jefferson Lakefront levee between Suburban Canal and Clearview Parkway $372,875.00
Lafourche-Terrebonne Scenic Byway Scenic Outlook Wharf 2 Lafourche Installation of Scenic Outlook wharf with lighting along batture across from the Lafourche Parish Tourist Commission Office $130,080.00
The Lafitte Corridor Greenway 2 Orleans Construction of 0.5 mile bike path along abandoned rail corridor and related work $313,248.00
Washington Tourist and Welcome Center 3 St Landry Construction of a Tourist and Welcome Center at the steamboat turnaround site located on Water Street along Bayou Courtableau (along existing scenic byway) $300,960.00
Catherine Street Sidewalk 3 St Mary Construction of sidewalk from Main Street (La 182) to La 90 to link key components of the City of Patterson $98,100.00
College Road Sidewalk 3 St. Landry Construction of sidewalks along College Road, Maple Ave., & S. Ninth St. $157,100.00
Saline Beautification Project 4 Bienville Installation of decorative street lamps, construction of new sidewalks, replace existing sidewalks, and landscape downtown area $210,425.00
North Bossier Pedestrian and Bicycle Trail 4 Bossier Construction of 10' asphalt shared use trail from North Park along Old Brownlee Road to Benoit Bayou, south along the bayou with a crossing to tie into existing Ped/Bike trail at intersection of Old Brownlee Road and Wemple Road, proceeding east along Wemple Road to Lakewood Subdivision $216,641.00
SUSL Campus Gateway Signs 4 Caddo Installation of 2 gateway signs for SUSL $44,000.00
Oil City Shared Use Interpretive Trail 4 Caddo Interpretive pedestrian/bike trial joining several important and historical areas of downtown highlighting the history of the oil and gas industry in Oil City $233,600.00
Greenwood Sidewalk Project 4 Caddo Sidewalk of West 70th Street (LA 511) between Waterwood Drive and Winburn Drive $45,700.00
Mansfield Neighborhood Sidewalk Program 4 DeSoto Installation of sidewalks to complete linking neighborhoods for the citizens of Mansfield $380,300.00
Ruston Downtown Revitalization Project, Phase III 5 Lincoln Continuation of Streetscape: upgrading one block of Trenton Street (US 167) from Mississippi Avenue to Park Avenue $297,500.00
Reclamation of Downtown Grambling 5 Lincoln Construction of new decorative sidewalks in downtown Grambling, installation of decorative street lights and an Information Center incorporating a kiosk design. $188,800.00
Louisville Avenue (US 80) Scenic Beautification (Riverside Dr to 6th St) Funding Increase Request 5 Ouachita Replace street lighting with decorative lighting, landscaping with irrigation, reconstruct 4' wide sidewalks (Request for increased funds) $239,300.00
West Monroe Downtown Enhancement 5 Ouachita Lighting, sidewalks and landscaping in West Monroe's Downtown Cottonport Historic District $182,210.00
Streetscaping US 167 at Bernice 5 Union Installation of concrete walkways and decorative street lighting along the north and south bound lanes from 2nd St to 6th Street $151,300.00
Texas and Pacific Railway Depot Rehabilitation Project 8 Natchitoches Rehabilitation of depot for African American Heritage Museum and multi modal transport hub. $273,900.00
US 167 South Gateway Enhancement 8 Winn Installation of landscaping along US 167 $271,700.00
Donaldsonville Sidewalks, Phase II 61 Ascension Rehabilitation of downtown sidewalk along both sides of Railroad Ave. from Mississippi St. to Nicholls St. $221,800.00
LA 44 & LA 1 Pedestrian Path, Phase II 61 Ascension Construction of sidewalks along LA 44 & LA 1 $517,000.00
Plantation Trace Travel Enhancement, Phase II 61 St. James Construction of levee-top bike path along Mississippi River, will proceed south from Phase I to St. James Math Center, 1 mile $400,800.00
Denham Springs Historic District Streetscaping 62 Livingston Construction of new decorative sidewalk in the Antique Village and installation of electrical conduit. $198,900.00
Pineview Sidewalk Extension 62 St Tammany Extension of Pineview sidewalk from middle school to the new Covington recreation park. $260,980.00
Ponchatoula Pedestrian Project, Phase I 62 Tangipahoa Installation of new sidewalks on LA 22 from 5th Street to Ford Street. $133,000.00
Washington Parish Landscaping Project - Bogalusa Corridor 62 Washington Installation of landscaping along LA Hwy 21 from the Washington Parish/St. Tammany Parish line to Bogalusa city limits $227,000.00
Selected Projects: 26Total Federal Funds Requested: $6,067,219.00